Quick answers
What is this project?
Diversion of 19.3778 Ha Reserved Forest Land for construction of 66KV Singarmal-Sutharpada with LILO to Nandgam D/C & M/C Tower Line with D/C ACSR Panther Conductor Line is a proposed power project in Bhavada Jagiri, Kaprada, Valsad, Gujarat. It seeks 47.9 acres of forest land.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Bhavada Jagiri, Kaprada, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹35 lakh and 47.9 acres (19.4 ha) of forest land.
When was it filed?
The application was filed on 1 Aug 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 24 Aug 2026 |
| Application filed | 1 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Forest land | 47.9 acres (19.4 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Bhavada Jagiri |
| Taluk / tehsil | Kaprada |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12408 |
In context
16 applications in Valsad since January 2022 are in the same category (Power): 9 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhavada Jagiri, Kaprada, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tokarpada Pumped Storage Hydroelectric Project (1300 MW) — returned to applicant, 1.8 km away
- Tokarpada Pumped Storage Project — cleared for impact study, 1.9 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — under forest review, 6.5 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — lapsed, 6.5 km away
- M/S. PRAMUKH STONE INDUSTRIES (Narwad Blacktrap Quarry Lease) — environmental approval granted, 8.5 km away
- M/s Raj Construction Co., Re-appraisal of Environment Clearance granted by… — not approved, 9.7 km away
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study, 12.3 km away
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study, 12.4 km away
More from Gujarat Energy Transmission Corp LTD in Valsad
- Submission Proposal for Diversion of Forest Land of 0.0217 Hectare for forest… — lapsed
- Submission of 0.3521 Forest Land (Protected) Proposal for Diversion for Social… — under forest review
- Diversion of 3.6709 Ha. Of Reserved Forest Land for construction of 66KV… — lapsed
- Diversion of 8.4109 Ha. Of Reserved Forest Land for construction of 66 KV… — more information requested
- Submission of 0.8848 Hac. Forest land proposal for Diversion for Social Forest… — forest land use approved
- Diversion of Forest Land of 0.0116 Hectare for forest clearance by Laying of… — forest land use approved
12 Gujarat Energy Transmission Corp projects in Valsad
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.