One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Grain Based Ethanol Plant of 250 KL/Day Capacity located at Survey No. 2270,…
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 25 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Daps Infra Private Limited |
| Land area | 15.7 acres (6.4 ha) |
| Project cost | ₹193.8 crore |
| Village / locality | Gangad |
| Taluk / tehsil | Bavla |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01006 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 25 Oct 2023 (this page) | Lapsed | 15.7 acres | ₹193.8 crore |
| New project filed 3 Oct 2022 | Environmental approval granted | 20.7 acres | ₹246 crore |
In context
218 applications in Ahmadabad since January 2022 are in the same category (Industry): 125 approved, 68 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15.7 acres, this one is larger than 93% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangad, Bavla, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Grain Based Ethanol Plant of 250 KL/Day Capacity located at Survey… — environmental approval granted, 0 m away
- Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350… — initial checks, 2.5 km away
- Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350… — environmental approval granted, 2.5 km away
- Laying of 66 KV S/C (3+1) Kalyangadh - Bhayla Under Ground Cable line by 1C x… — initial checks, 3.2 km away
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — initial checks, 3.9 km away
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — under environmental review, 3.9 km away
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — returned to applicant, 3.9 km away
- Proposed project of Bulk Drugs (API, API Intermediate, Preservatives)… — cleared for impact study, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.