Project details
| Status | Under environmental review |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 2 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Devkhush Infracon LLP |
| Use | Industrial |
| Units | 80 |
| Parking spaces | 34 |
| Land area | 141.1 acres (57.1 ha) |
| Plot area | 5,70,874 m² (61,44,831 sq ft) |
| Project cost | ₹7.8 crore |
| Village / locality | Kesrandi |
| Taluk / tehsil | Bavla |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11153 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Nov 2026 | Initial checks | 141.1 acres | ₹7.8 crore |
| Early planning filed 2 May 2026 (this page) | Under environmental review | 141.1 acres | ₹7.8 crore |
| Early planning filed 13 Dec 2025 | Returned to applicant | 141.1 acres | ₹7.8 crore |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 141.1 acres, this one is larger than 96% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kesrandi, Bavla, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — initial checks, 0 m away
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — returned to applicant, 0 m away
- Arvind Lake City — environmental approval granted, 1.2 km away
- Arvind Lake City — cleared for impact study, 1.2 km away
- Laying of 66 KV S/C (3+1) Kalyangadh - Bhayla Under Ground Cable line by 1C x… — initial checks, 2.2 km away
- work of laying of 66 KV S/C (3+1) Kerala - Kalyangadh Under Ground Cable line… — more information requested, 3.4 km away
- Greenfield Grain Based Ethanol Plant of 250 KL/Day Capacity located at Survey… — lapsed, 3.9 km away
- Greenfield Grain Based Ethanol Plant of 250 KL/Day Capacity located at Survey… — environmental approval granted, 3.9 km away
All 3 Devkhush Infracon projects across India