| Official title | Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350 Klpd (For Fuel Ethanol) Along With Captive Power Plant From 3.5 MW to 9.75 MW. |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Feb 2024 |
| Application filed | 26 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Grainspan Nutrients Private Limited |
| Land area | 34.5 acres (14 ha) |
| Project cost | ₹477.3 crore |
| Village / locality | Bhamsara |
| Taluk / tehsil | Bavla |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01462 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Dec 2025 | Initial checks | 34.5 acres | ₹477.3 crore |
| Expansion filed 26 Dec 2023 (this page) | Environmental approval granted | 34.5 acres | ₹477.3 crore |
In context
218 applications in Ahmadabad since January 2022 are in the same category (Industry): 125 approved, 68 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 34.5 acres, this one is larger than 98% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhamsara, Bavla, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Grain Based Distillery From 100 Klpd to 350… — initial checks, 0 m away
- Greenfield Grain Based Ethanol Plant of 250 KL/Day Capacity located at Survey… — lapsed, 2.5 km away
- Greenfield Grain Based Ethanol Plant of 250 KL/Day Capacity located at Survey… — environmental approval granted, 2.5 km away
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — initial checks, 4.8 km away
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — under environmental review, 4.8 km away
- Proposed Industrial Area Development Project of M/s. Devkhush Infracon LLP — returned to applicant, 4.8 km away
- Proposed project of Bulk Drugs (API, API Intermediate, Preservatives)… — cleared for impact study, 5.1 km away
- Proposed project of Bulk Drugs (API, API Intermediate, Preservatives)… — cleared for impact study, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.