Quick answers
What is MUL Mega Power Project?
MUL Mega Power Project is an approved power project in Navinal, Mundra, Kachchh, Gujarat. The site covers 66.6 acres.
Who is building it?
The applicant is Mpsez Utilities Limited.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 3 Nov 2025), as of 27 Nov 2026.
Where is it?
In Navinal, Mundra, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹14.6 crore and a site of 66.6 acres.
When was it filed?
The application was filed on 27 Jun 2025.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 3 Nov 2025 |
| Application filed | 27 Jun 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Power |
| Applicant | Mpsez Utilities Limited |
| Land area | 66.6 acres (27 ha) |
| Project cost | ₹14.6 crore |
| Village / locality | Navinal |
| Taluk / tehsil | Mundra |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14812 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jun 2025 (this page) | Coastal clearance granted | 66.6 acres | ₹14.6 crore |
| New project filed 2 Sept 2023 | Forest land use approved | 66.6 acres | ₹14.6 crore |
In context
75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 66.6 acres, this one is larger than 67% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Navinal, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to APSEZ Optimizes Mundra Port Waterfront in Kachchh for 514-Million-Tonne Capacity (6.7 km away).
Other projects nearby
- MUL Mega Power Project — forest land use approved, 0 m away
- 60000 TPA Copper tube plant by Kutch Copper Tubes Ltd at APSEZ, Survey no 223,… — cleared for impact study, 1.3 km away
- SVCT Mundra — environmental approval granted, 3.6 km away
- Supporting facility for Worker/Employees -(Mundra Central Kitchen by Adani… — initial checks, 3.9 km away
- Remaining 253 MLD SWRO Desalination plant out of earlier approved 300 MLD… — lapsed, 4.1 km away
- "Workmen Accommodation – Plot C" Building Construction Project by "Adani Ports… — environmental approval granted, 4.1 km away
- "Workmen Accommodation – Plot C" Building Construction Project by "Adani Ports… — withdrawn, 4.1 km away
- "Workmen Accommodation – Plot C" Building Construction Project by "Adani Ports… — environmental approval granted, 4.1 km away
More from Mpsez Utilities Limited in Kachchh
- 18m 66 KV Transmission Corridor by MPSEZ Utilities Limited (MUL) at Mundra,… — under coastal review
All 3 Mpsez Utilities projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.