What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Surat, Gujarat

Shukan River

Shukan River is an approved building project in Variav, Majura, Surat, Gujarat. The site covers 1.7 acres. Its stated project cost is ₹65.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 22 Feb 2023).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Shukan River?

Shukan River is an approved building project in Variav, Majura, Surat, Gujarat. The site covers 1.7 acres.

Who is building it?

The applicant is Mahavir Heights.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 22 Feb 2023), as of 27 Nov 2026.

Where is it?

In Variav, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹65.6 crore and a site of 1.7 acres.

When was it filed?

The application was filed on 22 Feb 2023.

Project details

StatusEnvironmental approval granted
Status since22 Feb 2023
Application filed22 Feb 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantMahavir Heights
Land area1.7 acres (0.7 ha)
Project cost₹65.6 crore
Village / localityVariav
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01085

What the filings say

What is planned

Mahavir Heights proposes to develop a residential building project named "Shukan River" in Variav, Surat. The applicant's conceptual plan describes a development consisting of five residential buildings, which are divided into eight blocks. Each building will have two basement levels, a ground floor or hollow plinth, and 14 upper floors, reaching a maximum height of 44.89 metres.

The project is designed to provide a total of 308 residential units. The built-up area summary indicates that the blocks are categorised as A, B, C, D-E, and F-G-H. Infrastructural features planned for the residents include a children's play area, a garden with a jogging park, and a clubhouse for the society.

ItemDetail
Total Residential Units308
Number of Buildings5
Number of Blocks8
Floors2 Basements + Ground + 14 Floors
Maximum Building Height44.89 m
Total Built-up Area50,191.25 sq. mt.
Total Plot Area6,880.00 sq. mt.
Expected Residents1,540

Layout and design

The site layout shows the buildings arranged around a central common plot area. The ground floor and first-floor podium levels will accommodate various amenities and entry points. Parking is distributed across the two basement levels and the hollow plinth area. The design incorporates energy-efficient materials such as 200 mm Autoclaved Aerated Concrete (AAC) blocks for walls and 150 mm Reinforced Cement Concrete (RCC) with polyurethane foam insulation for the roof.

Water, power and access

During the operation phase, the total water requirement is estimated at 219 kilolitres per day (KLD), with a fresh water requirement of 130 KLD to be sourced from the Surat Municipal Corporation (SMC). The project will generate approximately 173 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 200 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water (89 KLD) will be recycled for flushing and gardening, while the remaining 84 KLD will be discharged into the SMC drainage line.

Electrical power will be supplied by Dakshin Gujarat Vij Company Limited (DGVCL), with an estimated maximum demand of 1,600 KW. For emergency backup, the applicant proposes to install four diesel generator sets of 125 KVA each. Solar power generation with a capacity of 150 KW is also planned for common area lighting.

Access to the site is provided via an 18-metre wide road, with two entry and exit gates planned for the project.

Environmental safeguards

The project includes a green belt development covering 700 sq. mt. (approximately 10.17% of the plot area), where 110 trees are expected to be planted. For rainwater harvesting, the applicant plans to provide two recharging borewells. Solid waste management will involve an on-site organic waste convertor with a capacity of 200 kg/day to process wet waste into manure. Dry waste will be collected in bins and disposed of through the SMC waste collection system.

Timeline

According to an undertaking filed by the partners of Mahavir Heights in February 2023, no construction activity had been initiated at the site at the time of the application. The project is categorized as a new building and township development requiring environmental clearance.

Shukan River site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Shukan River: Site layout plan: building blocks, roads, and common open spaces (preview)🔒 Sign in free to see it
Site layout plan: building blocks, roads, and common open spaces
Shukan River: Parking layout: basement and ground floor parking arrangements (preview)🔒 Sign in free to see it
Parking layout: basement and ground floor parking arrangements
Shukan River: Floor plans: typical residential unit layouts and floor sections (preview)🔒 Sign in free to see it
Floor plans: typical residential unit layouts and floor sections
Shukan River: Building elevation and cross-section showing 14 floors and basements (preview)🔒 Sign in free to see it
Building elevation and cross-section showing 14 floors and basements

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.7 acres, this one is larger than 58% of them.

38 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Variav, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.