Quick answers
What is Sun Saritam?
Sun Saritam is an approved residential project in Variav, Majura, Surat, Gujarat. It plans 336 units in 6 towers of up to 14 floors on 1.9 acres.
Who is building it?
The applicant is Sun Infra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Jan 2025), as of 27 Nov 2026.
Where is it?
In Variav, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹59.5 crore and a site of 1.9 acres.
When was it filed?
The application was filed on 1 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jan 2025 |
| Application filed | 1 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sun Infra |
| Use | Residential |
| Units | 336 |
| Towers | 6 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 513 |
| Land area | 1.9 acres (0.8 ha) |
| Built-up area | 47,176 m² (5,07,798 sq ft) |
| Plot area | 7,781 m² (83,754 sq ft) |
| Project cost | ₹59.5 crore |
| Village / locality | Variav |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05655 |
What the filings say
What is planned
The applicant, Sun Infra, proposes the construction of a residential project named Sun Saritam. According to the project reports, the development will consist of six residential buildings, designated as Towers A, B, C, D, E, and F. Each tower is designed to have a ground floor and 14 upper floors. The project is planned to provide a total of 336 residential units, with each of the six buildings containing 56 units.
The project includes two basement levels (Lower and Upper Basement) dedicated to parking and utilities. The total building height is specified as 44.80 metres. The built-up area is distributed across the towers, with Towers A, B, and E having slightly different floor areas compared to Towers C, D, and F.
Key Figures
| Item | Detail |
|---|---|
| Total Residential Units | 336 |
| Number of Towers | 6 |
| Floors per Tower | Ground + 14 |
| Total Plot Area | 7,781 sq. mt. (1.93 acres) |
| Common Plot Area | 780.81 sq. mt. |
| STP Capacity | 200 KLD |
| Solar Power Capacity | 90 KW |
| Organic Waste Convertor | 500 Kg/Day |
Layout and design
The site layout features the six towers arranged around a central common plot of 780.81 square metres. Internal roads with a width of 7.50 metres are planned to provide access within the complex. The project includes a significant parking infrastructure across the two basement levels and the ground floor, with a total proposed parking area of 12,031.45 square metres. This includes specific provisions for 26 parking spaces for physically disabled persons.
Land and surroundings
The project is located on Block No. 1355 at Variav in Surat. The site is bounded by an 18.00-metre wide Town Planning (T.P.) road. Adjacent properties include other residential blocks and designated garden and open spaces. The net plot area for the development is 7,781 square metres (1.93 acres).
Water, power and access
Water requirements will be managed through a planned Sewage Treatment Plant (STP) with a capacity of 200 kilolitres per day (KLD), using MBAR technology. For power, the applicant proposes to install a 90 KW rooftop solar system covering 540 square metres of terrace space. Diesel Generator (D.G.) sets are planned for emergency backup power and will be housed in acoustic enclosures to mitigate noise. Rainwater harvesting will be implemented through two percolating wells.
Environmental safeguards
The applicant's environmental management plan includes a total capital expenditure of ₹3.03 crore. Key features include:
- Waste Management: An automatic Organic Waste Convertor with a capacity of 500 kg per day will be installed to handle domestic garbage.
- Green Belt: A total green area of 1,184.45 square metres is planned, representing 15.46% of the plot area. This includes 403.64 square metres of tree cover and 780.81 square metres of lawn. The applicant intends to plant 200 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem.
- Pollution Control: Dust mitigation measures and noise control engineering will be implemented during both construction and operation phases.
Timeline
The applicant's project report states that the entire project is expected to be completed within approximately four years. The installation of environmental management units will proceed parallel to the construction of the buildings.
Sun Saritam site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.9 acres, this one is larger than 65% of them.
37 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Variav, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sun Saritam — withdrawn, 0 m away
- Shukan River — environmental approval granted, 50 m away
- Nilkanth Luxuria — environmental approval granted, 700 m away
- Saundarya Velly — environmental approval granted, 800 m away
- Rivanta Heritage — environmental approval granted, 800 m away
- Road work from subgrade to wearing course as per MoRTH 2013 (fifth revision)… — more information requested, 1.1 km away
- Nilkanth Trinity — environmental approval granted, 1.1 km away
- Panch Valley — initial checks, 1.2 km away
More from Sun Infra in Surat
- Sun Saritam — withdrawn
All 3 Sun Infra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.