Environmental approval grantedBuildings & townships · Surat, Gujarat

Nilkanth Trinity

Nilkanth Trinity is an approved residential project in Variav, Majura, Surat, Gujarat. It plans 256 units in 3 towers of up to 22 floors on 1.3 acres. Its stated project cost is ₹45 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Jul 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Nilkanth Trinity?

Nilkanth Trinity is an approved residential project in Variav, Majura, Surat, Gujarat. It plans 256 units in 3 towers of up to 22 floors on 1.3 acres.

Who is building it?

The applicant is Dhrunal Mahendrabhai Patel.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Jul 2026), as of 27 Nov 2026.

Where is it?

In Variav, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹45 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 25 Apr 2026.

Project details

StatusEnvironmental approval granted
Status since10 Jul 2026
Application filed25 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantDhrunal Mahendrabhai Patel
UseResidential
Units256
Towers3
Floors (tallest)22
Basements2
Parking spaces271
Land area1.3 acres (0.5 ha)
Built-up area35,422 m² (3,81,279 sq ft)
Plot area5,340 m² (57,479 sq ft)
Project cost₹45 crore
Village / localityVariav
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-11029

What the filings say

What is planned

Nilkanth Trinity is a proposed residential building project by the applicant, Dhrunal Mahendrabhai Patel. According to the conceptual plan, the development will consist of three residential buildings, each reaching a height of 22 floors above a hollow plinth and two basement levels. The project is designed to accommodate 256 residential units.

The total built-up area for the project is 35,422.18 square metres, with a Floor Space Index (FSI) area of 20,862.80 square metres. The infrastructure will include several amenities for residents:

Project Components

ItemDetail
Number of Buildings3
Tallest Building Height69.90 metres
Total Residential Units256
Basements2 (Lower and Upper)
Total Built-up Area35,422.18 sq. mt.
FSI Area20,862.80 sq. mt.
Ground Coverage1,437.36 sq. mt.

Layout and design

The site layout shows the three residential blocks (A, B, and C) arranged around a central open space. Block A is positioned separately, while Blocks B and C are connected. The project features a 6.00-metre wide approach road and internal roads of 7.00 metres. Two entry and exit gates are planned for the premises.

Parking is distributed across multiple levels, providing a total of 271 Equivalent Car Spaces (ECS). This includes 202 spaces in the basement, 36 in the hollow plinth, and 33 on the first floor. Additionally, 30 visitor parking spaces are designated.

Water, power and access

During the operation phase, the total water requirement is estimated at 199 kilolitres per day (kl/day). Of this, 117 kl/day will be fresh water supplied by the Surat Municipal Corporation (SMC), while 82 kl/day will be recycled from treated wastewater. Recycled water will be used for flushing (79 kl/day) and gardening (3 kl/day).

The electrical load demand is estimated at 1,300 KW, to be sourced from Dakshin Gujarat Vij Company Limited (DGVCL). For emergency backup, the applicant proposes to install two silent diesel generator sets of 125 KVA each. Solar power will be integrated into the design, with 241 solar panels providing 130 KW for common area lighting and other utilities.

Environmental safeguards

The project will include a Sewage Treatment Plant (STP) with a capacity of 190 kl/day using Moving Bed Biofilm Reactor (MBBR) technology. For solid waste, an organic waste convertor with a capacity of 350 kg/day will be installed to treat kitchen waste and produce manure for on-site gardening.

Rainwater harvesting will be implemented through two percolation wells with a depth of 40 metres to recharge groundwater. A green belt area of 600 square metres (0.06 hectares) is planned, which will include the planting of 140 trees of species such as Gulmohar, Limdo, and Badam.

Timeline

The applicant submitted an undertaking on 20 April 2026 stating that no construction activity had started at the site prior to obtaining environmental clearance. The project cost is estimated at ₹45 crore, which includes ₹20 crore for land and ₹25 crore for construction.

Nilkanth Trinity site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Nilkanth Trinity: Site layout: residential blocks, roads, and common plot areas (preview)🔒 Sign in free to see it
Site layout: residential blocks, roads, and common plot areas
Nilkanth Trinity: Parking and basement plan showing circulation and ramps (preview)🔒 Sign in free to see it
Parking and basement plan showing circulation and ramps
Nilkanth Trinity: Front elevation showing the 22-floor building profile (preview)🔒 Sign in free to see it
Front elevation showing the 22-floor building profile
Nilkanth Trinity: Location map: project site relative to the Tapi river and Surat city (preview)🔒 Sign in free to see it
Location map: project site relative to the Tapi river and Surat city

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 64% of them.

40 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Variav, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.