What is Developing? Open the mapMap

LapsedIndustry · Bhavnagar, Gujarat

Proposed Project for Manufacturing of Various Synthetic Organic Chemicals by Blackbuck Chemtech (India) Private Limited

Proposed Project for Manufacturing of Various Synthetic Organic Chemicals by Blackbuck Chemtech (India) Private Limited is a lapsed industrial project in Chamardi, Vallabhipur, Bhavnagar, Gujarat. The site covers 4.4 acres. Its stated project cost is ₹22.1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Bhavnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project for Manufacturing of Various Synthetic Organic Chemicals by Blackbuck Chemtech (India) Private Limited is a lapsed industrial project in Chamardi, Vallabhipur, Bhavnagar, Gujarat. The site covers 4.4 acres.

Who is building it?

The applicant is Blackbuck Chemtech (India) Private Limited.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Chamardi, Vallabhipur, Bhavnagar, Gujarat.

How big is it?

It has a stated cost of ₹22.1 crore and a site of 4.4 acres.

When was it filed?

The application was filed on 29 Jul 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Project for Manufacturing of Various Synthetic Organic Chemicals by Blackbuck…

Project details

StatusLapsed
Status since29 Oct 2024
Application filed29 Jul 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBlackbuck Chemtech (India) Private Limited
Land area4.4 acres (1.8 ha)
Project cost₹22.1 crore
Village / localityChamardi
Taluk / tehsilVallabhipur
DistrictBhavnagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01266

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 29 Jul 2023 (this page)Lapsed4.4 acres₹22.1 crore
New project filed 21 Jul 2023Environmental approval granted4.4 acres₹22.1 crore
Early planning filed 2 Jun 2023Withdrawn4.4 acres₹22.1 crore

In context

34 applications in Bhavnagar since January 2022 are in the same category (Industry): 18 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.4 acres, this one is smaller than 65% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chamardi, Vallabhipur, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Blackbuck Chemtech projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.