What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Surat, Gujarat

Silent Residency

Silent Residency is an approved building project in Valak, Kamrej, Surat, Gujarat. The site covers 1.4 acres. Its stated project cost is ₹39.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Oct 2023).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Silent Residency?

Silent Residency is an approved building project in Valak, Kamrej, Surat, Gujarat. The site covers 1.4 acres.

Who is building it?

The applicant is Ronak Paladiya.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Oct 2023), as of 27 Nov 2026.

Where is it?

In Valak, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹39.3 crore and a site of 1.4 acres.

When was it filed?

The application was filed on 26 Oct 2023.

Project details

StatusEnvironmental approval granted
Status since26 Oct 2023
Application filed26 Oct 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRonak Paladiya
Land area1.4 acres (0.6 ha)
Project cost₹39.3 crore
Village / localityValak
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01463

What the filings say

What is planned

Silent Residency is a residential project proposed by Ronak Paladiya on a plot area of 5,768 square metres (0.58 hectares). The applicant's project report describes a development consisting of five residential buildings, designated as Blocks A, B, C, D, and E, all rising to a height of 44.95 metres.

The project includes two basement levels for parking and services, a ground floor, and 14 upper floors. The total built-up area is planned at 39,796.47 square metres, with a Floor Space Index (FSI) area of 23,070.32 square metres.

Building Components

Layout and design

The site layout features the five blocks arranged around a central common plot. Access to the project is provided via a 24.00-metre wide Development Plan (DP) road. Internal approaches are planned with a width of 7.50 metres.

Residential units are designed with various configurations, including 3BHK apartments. Typical floor plans for Blocks A and B show units with a RERA carpet area of approximately 85.68 square metres, plus wash areas and balconies. The design incorporates fire-resistant enclosures for lifts and staircases, and fire-proof doors at each level.

Land and surroundings

The project is located at Valak in the Kamrej taluk of Surat. The site is bounded by a 24.00-metre wide DP road to the west. Adjacent plots include social infrastructure reservations (R-6 and R-7) and other residential blocks. The applicant plans to develop a green belt covering 897.12 square metres, which represents 15.55% of the total plot area. This includes 320.01 square metres of tree cover and 577.11 square metres of lawn. Approximately 150 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem are proposed.

Water, power and access

Water requirements will be met through local sources, with a planned 175 kilolitres per day (KLD) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP) for wastewater management. For rainwater harvesting, the applicant proposes a collection system with two percolating recharge wells.

Power will be sourced from the local grid, supplemented by a 70 kW rooftop solar energy system requiring 420 square metres of terrace space. Diesel Generator (DG) sets are planned for emergency backup, located in the basement with acoustic enclosures and chimneys as per regulatory standards.

Environmental safeguards

The Environmental Management Plan (EMP) outlines measures for both construction and operation phases:

ItemDetail
Total Plot Area5,768.00 sq. mt.
Total Built-up Area39,796.47 sq. mt.
FSI Area23,070.32 sq. mt.
Common Plot Area577.11 sq. mt.
Building Height44.95 metres
Total Floors2 Basements + Ground + 14 Floors
Proposed Trees150 nos.
Solar Power Capacity70 kW
STP Capacity175 KLD

Timeline

The applicant's environmental management plan states that the entire project is expected to be completed within approximately four years from commencement.

Silent Residency site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Silent Residency: Site layout: building blocks, common plot, and road access (preview)🔒 Sign in free to see it
Site layout: building blocks, common plot, and road access
Silent Residency: Parking plan: basement and ground level layouts with calculations (preview)🔒 Sign in free to see it
Parking plan: basement and ground level layouts with calculations
Silent Residency: Building elevation and sectional view of Blocks A & B (preview)🔒 Sign in free to see it
Building elevation and sectional view of Blocks A & B
Silent Residency: Typical floor plan and unit layout for Blocks A & B (preview)🔒 Sign in free to see it
Typical floor plan and unit layout for Blocks A & B

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 55% of them.

170 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Valak, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ronak Paladiya in Surat

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.