What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Surat, Gujarat

Silent Vista

Silent Vista is an approved residential project in Valak, Kamrej, Surat, Gujarat. It plans 278 units in 5 towers of up to 14 floors on 1.3 acres. Its stated project cost is ₹34.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Aug 2025).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Silent Vista?

Silent Vista is an approved residential project in Valak, Kamrej, Surat, Gujarat. It plans 278 units in 5 towers of up to 14 floors on 1.3 acres.

Who is building it?

The applicant is J Eklera Realty LLP.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Aug 2025), as of 27 Nov 2026.

Where is it?

In Valak, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹34.5 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 2 May 2025.

Project details

StatusEnvironmental approval granted
Status since26 Aug 2025
Application filed2 May 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantJ Eklera Realty LLP
UseResidential
Units278
Towers5
Floors (tallest)14
Basements2
Parking spaces356
Land area1.3 acres (0.5 ha)
Built-up area38,169 m² (4,10,847 sq ft)
Plot area5,421 m² (58,351 sq ft)
Project cost₹34.5 crore
Village / localityValak
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-07834

What the filings say

What is planned

J Eklera Realty LLP proposes to develop a residential project named Silent Vista in Valak village, Surat. The applicant's project report indicates the construction of five residential buildings, designated as Blocks A through E, each consisting of a ground floor and 14 upper floors. The project is designed to accommodate a total of 280 residential units.

The residential units are distributed across the blocks as follows:

The project includes two basement levels for parking and services. The total built-up area is planned at 38,168.83 square metres, with a Floor Space Index (FSI) area of 21,683.82 square metres.

Layout and design

The site layout features five distinct towers arranged around a central common plot. The common plot area is 542.23 square metres, which will be developed with lawn and landscaping. Internal road widths are planned at 7.50 metres.

Each building is designed with a maximum height of 44.90 metres. The typical floor plans show units with dedicated wash areas and balconies. Vertical circulation in each block is provided by two lifts, including one designated as a fire lift. The ground floor level is raised by 0.23 metres above the ground level.

Parking is provided across the ground level and two basement floors. The total proposed parking area is 11,162.87 square metres, which includes 10,523.90 square metres for occupiers and 638.97 square metres for visitors. This space is intended to accommodate both four-wheelers and two-wheelers.

Land and surroundings

The project is situated on a plot of 0.54 hectares (1.33 acres) in the Valak area of Surat. The site is bounded by a 24.00-metre wide Development Plan (DP) road. The surrounding land use includes residential zones and a recreation zone. A 100-metre margin line for a recreation zone is noted near the property boundary. The applicant has planned a total green area of 852.72 square metres, representing 15.72% of the plot area, which includes 140 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem.

Water, power and access

Water requirements will be met through the Surat Municipal Corporation (SMC) supply. The project includes two percolating wells for rainwater harvesting and a collection system with a total capital cost of ₹4.00 lakh. For wastewater, the applicant proposes a 200 KLD Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP) with a capital investment of ₹24.00 lakh. Treated sewage will be discharged into the SMC drainage system.

Power will be sourced from the local grid. The applicant plans to install a 75 KW rooftop solar energy system covering 450 square metres of terrace space. Diesel Generator (DG) sets will be provided for emergency backup, housed in the basement with acoustic enclosures.

Environmental safeguards

The Environmental Management Plan (EMP) includes a total capital expenditure of ₹256.60 lakh and an annual recurring cost of ₹34.59 lakh. Key components of the EMP include:

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately three years from the start of construction. Installation of environmental management units will proceed in parallel with the building construction.

Silent Vista site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Silent Vista: Site layout: five towers, central common plot, and 24m DP road access (preview)🔒 Sign in free to see it
Site layout: five towers, central common plot, and 24m DP road access
Silent Vista: Typical floor plan for Block A showing four residential units per floor (preview)🔒 Sign in free to see it
Typical floor plan for Block A showing four residential units per floor
Silent Vista: Building elevation and cross-section showing 14 floors and basement levels (preview)🔒 Sign in free to see it
Building elevation and cross-section showing 14 floors and basement levels
Silent Vista: Parking layout plan for basement and ground levels (preview)🔒 Sign in free to see it
Parking layout plan for basement and ground levels

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 62% of them.

169 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Valak, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from J Eklera Realty LLP in Surat

All 5 J Eklera Realty projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.