Environmental approval grantedBuildings & townships · Surat, Gujarat

Silent Sky

Silent Sky is an approved building project in Valak, Kamrej, Surat, Gujarat. The site covers 1 acre. Its stated project cost is ₹27.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Oct 2023).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Silent Sky?

Silent Sky is an approved building project in Valak, Kamrej, Surat, Gujarat. The site covers 1 acre.

Who is building it?

The applicant is Ronak Paladiya.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Oct 2023), as of 27 Nov 2026.

Where is it?

In Valak, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹27.1 crore and a site of 1 acre.

When was it filed?

The application was filed on 26 Oct 2023.

Project details

StatusEnvironmental approval granted
Status since26 Oct 2023
Application filed26 Oct 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRonak Paladiya
Land area4,000 m²
Project cost₹27.1 crore
Village / localityValak
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01913

What the filings say

What is planned

Silent Sky is a residential project proposed by Ronak Paladiya in Valak, Surat. The applicant's project report describes a development consisting of four residential buildings (Blocks A, B, C, and D) with a maximum height of 44.95 metres. Each building is planned to have a ground floor and 14 upper floors, supported by two levels of basement parking.

The project is designed to provide a total of 224 dwelling units. According to the layout plans, the unit distribution is as follows:

The total built-up area is planned at 27,039.60 square metres, with a Floor Space Index (FSI) area of 15,436.54 square metres.

Layout and design

The site layout features the four residential blocks arranged around a central open space. Block A and Block D are situated on the outer flanks, while Blocks B and C form a larger central structure. A 24-metre wide Development Plan (DP) road provides the primary access to the site.

The ground floor is dedicated to parking and entrance foyers. The typical floor plans indicate three-bedroom (3BHK) apartments. Each unit includes a living room, kitchen/dining area, master bedroom with attached toilet, and additional bedrooms. Balconies and wash areas are integrated into the unit designs. The buildings will be equipped with both standard and fire lifts.

Water, power and access

Water requirements for the project include a planned 150 kilolitres per day (KLD) capacity Sewage Treatment Plant (STP) using Membrane Bioreactor (MBR) technology. For rainwater management, the applicant proposes a collection system with one percolating recharge well. Three underground water tanks, each with a capacity of 75,000 litres, are shown on the plans.

Power will be sourced from the local grid, with Diesel Generator (DG) sets provided for emergency backup. The DG sets are planned for installation in the basement with acoustic enclosures to manage noise. The project also incorporates a 60 KW rooftop solar energy system, requiring approximately 360 square metres of terrace space.

Vehicular access is provided via 7.50-metre wide internal approach roads. Parking is distributed across the ground level and two basement levels. The total proposed parking area is 6,896.43 square metres, intended to accommodate 270 cars. This includes 22 designated spaces for physically disabled persons.

Environmental safeguards

The Environmental Management Plan (EMP) outlines a total capital expenditure of ₹1.92 crore. Key components include:

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately four years. The installation of environmental management units is planned to proceed parallel to the building construction.

Silent Sky site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Silent Sky: Site layout: residential blocks, internal roads, and common open plot (preview)🔒 Sign in free to see it
Site layout: residential blocks, internal roads, and common open plot
Silent Sky: Parking plan: ground and basement level vehicle layouts (preview)🔒 Sign in free to see it
Parking plan: ground and basement level vehicle layouts
Silent Sky: Building elevation and section showing 14 floors and basement (preview)🔒 Sign in free to see it
Building elevation and section showing 14 floors and basement
Silent Sky: Typical floor plan for Block A showing 3BHK unit layouts (preview)🔒 Sign in free to see it
Typical floor plan for Block A showing 3BHK unit layouts

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 87% of them.

170 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Valak, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.