Quick answers
What is this project?
New Proposed Residential Construction Project by Mr. Babubhai Patel is an approved building project in Bharthan, Majura, Surat, Gujarat. The site covers 1.8 acres.
Who is building it?
The applicant is Babubhai Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 May 2023), as of 27 Nov 2026.
Where is it?
In Bharthan, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹61.4 crore and a site of 1.8 acres.
When was it filed?
The application was filed on 18 May 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 May 2023 |
| Application filed | 18 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Babubhai Patel |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹61.4 crore |
| Village / locality | Bharthan |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01799 |
In context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 60% of them.
158 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bharthan, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Martand Stava — environmental approval granted, 100 m away
- Atlas — environmental approval granted, 400 m away
- Avadh Paloma Pride — environmental approval granted, 450 m away
- Rajhans Golf Link — environmental approval granted, 500 m away
- Rajhans Golf Link — cleared for impact study, 500 m away
- Construction of Proposed Commercial Building-Thoth Mall — environmental approval granted, 700 m away
- Expansion of "Thoth Mall" — under environmental review, 700 m away
- Expansion of "Thoth Mall" — cleared for impact study, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.