Quick answers
What is Atlas?
Atlas is an approved building project in Bharthan, Majura, Surat, Gujarat. The site covers 0.9 acres.
Who is building it?
The applicant is Maxiple Developers LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Sept 2023), as of 27 Nov 2026.
Where is it?
In Bharthan, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹82.4 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 7 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Sept 2023 |
| Application filed | 7 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Maxiple Developers LLP |
| Land area | 3,500 m² |
| Project cost | ₹82.4 crore |
| Village / locality | Bharthan |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-01961 |
What the filings say
What is planned
Maxiple Developers LLP proposes to develop a commercial building project named "Atlas" in Bharthan, Surat. According to the applicant's conceptual plan, the project will consist of a single commercial building with a total built-up area of 23,454.29 square metres.
The building is designed with three basement levels, a hollow plinth, and 12 floors above ground, reaching a maximum height of 45 metres. The project will house 158 units in total, comprising 21 shops and 137 offices. The shops are primarily located on the ground and first floors, while the upper floors are dedicated to office spaces.
| Item | Detail |
|---|---|
| Total Built-up Area | 23,454.29 sq. mt. |
| FSI Area | 14,025.49 sq. mt. |
| Building Configuration | 3 Basements + Ground + 12 Floors |
| Total Units | 158 (21 Shops, 137 Offices) |
| Expected Occupants | 632 users and 126 visitors |
| Total Project Cost | ₹82.36 crore |
Layout and design
The project is situated on a plot of 0.35 hectares (0.87 acres). The layout includes a common plot area of 363 square metres. The building design incorporates a glass envelope optimized for thermal characteristics and natural light.
Parking is planned across multiple levels to accommodate 284 Equivalent Car Spaces (ECS). This includes 210 spaces in the basements, 31 spaces on the surface, and 43 spaces via mechanical parking systems in the basement. The design also includes 58 electric vehicle charging points located in the ground and basement areas.
Water, power and access
During the operation phase, the total water requirement is estimated at 32 kilolitres per day (KLD). Of this, 18.2 KLD will be fresh water sourced from the Surat Municipal Corporation (SMC), and 13.8 KLD will be recycled water used for flushing and gardening. A Sewage Treatment Plant (STP) with a capacity of 30 KLD using Moving Bed Biofilm Reactor (MBBR) technology will be installed on-site.
The electrical load demand is projected at 800 kW, to be supplied by Dakshin Gujarat Vij Company Limited (DGVCL). For backup power, the applicant proposes two silent diesel generator sets of 125 kVA each. Energy conservation measures include the installation of a 90 kW solar power system consisting of 167 panels on the rooftop.
Access to the site is provided by two gates from an adjacent 12-metre wide public road. Internal roads will have a width of 6 metres.
Environmental safeguards
The applicant has budgeted ₹5.66 crore for the Environmental Management Plan. Key provisions include:
- Waste Management: An Organic Waste Convertor (OWC) with a capacity of 100 kg/day will process wet waste into manure. Dry waste will be collected in bins and disposed of through the SMC system.
- Rainwater Harvesting: One recharge well is planned to recharge groundwater, with a dedicated filtration system for rooftop runoff.
- Green Belt: A total green area of 400 square metres is proposed, including the planting of 89 trees such as Gulmohar, Jambu, and Limdo.
- Fire Safety: The building will be equipped with an automatic hydrant and sprinkler system, a fire alarm system, and an underground fire water storage tank of 4,00,000 litres capacity.
Timeline
The applicant stated in an undertaking dated August 2023 that no construction activity had started at the site prior to obtaining environmental approval. The project is categorized as a B2 project under the Environmental Impact Assessment notification.
Atlas site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 95% of them.
154 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bharthan, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Martand Stava — environmental approval granted, 400 m away
- New Proposed Residential Construction Project by Mr. Babubhai Patel — environmental approval granted, 400 m away
- Rajhans Golf Link — environmental approval granted, 500 m away
- Rajhans Golf Link — cleared for impact study, 500 m away
- Maestro Serenity Cove — environmental approval granted, 500 m away
- Maestro Serenity Cove — withdrawn, 500 m away
- Maestro Serenity Cove — environmental approval granted, 500 m away
- Avadh Paloma Pride — environmental approval granted, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.