Cleared for impact studyBuildings & townships · Surat, Gujarat

Rajhans Golf Link

Rajhans Golf Link is a proposed building project in Bharthan, Majura, Surat, Gujarat. The site covers 6.2 acres. Its stated project cost is ₹441.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 May 2023).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Rajhans Golf Link?

Rajhans Golf Link is a proposed building project in Bharthan, Majura, Surat, Gujarat. The site covers 6.2 acres.

Who is building it?

The applicant is Rajhans Infracon (India) Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 May 2023), as of 27 Nov 2026.

Where is it?

In Bharthan, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹441.7 crore and a site of 6.2 acres.

When was it filed?

The application was filed on 31 May 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Rajhans Golf Link

Project details

StatusCleared for impact study
Status since31 May 2023
Application filed31 May 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantRajhans Infracon (India) Private Limited
Land area6.2 acres (2.5 ha)
Project cost₹441.7 crore
Village / localityBharthan
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-02353

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 2 Feb 2024Environmental approval granted6.2 acres₹441.7 crore
Early planning filed 31 May 2023 (this page)Cleared for impact study6.2 acres₹441.7 crore

What the filings say

What is planned

RAJHANS GOLF LINK is a residential high-rise expansion project. The project proponent, Rajhans Infracon (India) Private Limited, acquired the site from Newtone Gardens LLP in September 2022 and is expanding the scope of a previously granted environmental clearance.

The project consists of six residential buildings (Blocks A to F) and one club house. Each building is designed with a ground floor (hollow plinth) and 18 upper floors. The expansion primarily increases the basement area for parking and adds terrace floor area, bringing the total built-up area to 1,70,448.98 m².

The development will provide 204 residential flats with the following configurations:

As of early 2024, construction of the basement and ground floor was complete, and work on the second floor was in progress. The applicant expects to complete the remaining construction within five years.

Layout and design

The site layout features six building blocks arranged around the periphery with a central common plot and internal driveways. The maximum building height is 65.29 metres. The project includes two levels of basement parking.

ItemDetail
Net Plot Area25,082.00 m²
FSI Area1,00,328.00 m²
Total Built-up Area1,70,448.98 m²
Ground Coverage6,518.50 m²
Total Basement Area44,132.44 m²
Green Belt Area2,510.00 m²
Total Parking Provided46,387.62 m² (1,476 ECS)

Water, power and access

Water for the project will be supplied by the Surat Municipal Corporation (SMC). During the operation phase, the total water requirement is estimated at 303.50 kilolitres per day (KLD). This includes 223.75 KLD of fresh water and 79.75 KLD of recycled water for flushing and gardening.

Waste water generation is projected at 234.50 KLD. The applicant proposes an on-site Sewage Treatment Plant (STP) with a capacity of 260 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing (69.50 KLD) and gardening (10.25 KLD), with the remaining 140 KLD discharged into the SMC underground drainage system.

Power will be sourced from Dakshin Gujarat Vij Co. Ltd. (DGVCL), with a maximum demand of 1,876.30 KWh. A 220 KVA diesel generator set will provide backup power. The project includes 176 KW of solar power generation and 102 electric vehicle charging points.

Access to the site is via an 18-metre wide public road, with separate entry and exit points provided for traffic management.

Environmental safeguards

The applicant plans to develop a green belt of 2,510.00 m², which includes 1,980.00 m² of lawn and 660.00 m² for tree plantation at the periphery. A total of 635 trees are proposed.

For solid waste, the project will generate approximately 514.08 kg/day of dry waste and 342.72 kg/day of wet waste. Wet waste will be treated in an on-site Organic Waste Converter (OWC) to produce fertilizer for the gardens. Rainwater harvesting will be implemented through six recharge pits with desilting chambers.

During construction, dust mitigation measures include 6-metre high peripheral barricading, water sprinkling, and covering building materials with tarpaulin. Noise-generating activities will be restricted to daytime hours.

Timeline

The project implementation schedule indicates a five-year construction period. Following the grant of the amended environmental clearance, the applicant plans to complete the additional basement work, followed by the upper floors, finishing, and installation of fire safety measures. Possession is expected to be handed over to flat holders after obtaining the Building Use Certificate (BUC) from the SMC.

Rajhans Golf Link site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Rajhans Golf Link: Site layout: building blocks, internal roads, and green spaces (preview)🔒 Sign in free to see it
Site layout: building blocks, internal roads, and green spaces
Rajhans Golf Link: Typical floor plan for Building Type A (preview)🔒 Sign in free to see it
Typical floor plan for Building Type A
Rajhans Golf Link: Building elevation and sectional view (preview)🔒 Sign in free to see it
Building elevation and sectional view
Rajhans Golf Link: STP schematic flow diagram (preview)🔒 Sign in free to see it
STP schematic flow diagram

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.2 acres, this one is larger than 92% of them.

153 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bharthan, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rajhans Infracon (India) Private Limited in Surat

All 6 Rajhans Infracon projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.