Environmental approval grantedBuildings & townships · Kachchh, Gujarat

Building project by Detox India PVT. LTD.

This approved building project by Detox India PVT. LTD. is in Katariya Juna, Bhachau, Kachchh, Gujarat. The site covers 40 acres. Its stated project cost is ₹81 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Apr 2024).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Building project by Detox India PVT. LTD.?

This approved building project by Detox India PVT. LTD. is in Katariya Juna, Bhachau, Kachchh, Gujarat. The site covers 40 acres.

Who is building it?

The applicant is Detox India PVT. LTD..

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 3 Apr 2024), as of 27 Nov 2026.

Where is it?

In Katariya Juna, Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹81 crore and a site of 40 acres.

When was it filed?

The application was filed on 3 Apr 2024.

Project details

StatusEnvironmental approval granted
Status since3 Apr 2024
Application filed3 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantDetox India PVT. LTD.
Land area40 acres (16.2 ha)
Project cost₹81 crore
Village / localityKatariya Juna
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01996

What the filings say

What is planned

Detox India Private Limited (DIPL) proposes to expand its existing Common Hazardous Waste Treatment, Storage and Disposal Facility (CHWTSDF). The expansion aims to increase the capacity of the Secured Landfill Facility (SLF) from 1.455 million metric tonnes (MMT) to 2.755 MMT. This expansion is planned within the existing 16.19-hectare (40-acre) plot. The facility caters to over 5,000 industrial units across Gujarat, managing waste from sectors such as pharmaceuticals, pesticides, and oil and gas.

Project Components

The facility includes several specialized units for waste management:

Layout and design

The landfill cells are designed with a double composite liner system as per Central Pollution Control Board (CPCB) guidelines. The base liner consists of twelve layers, including 450 mm thick amended clay, 6.5 mm geosynthetic clay liners, 1.5 mm High-Density Polyethylene (HDPE) liners, and 300 mm drainage layers composed of sand and gravel. The side liners use a six-layer system.

A permanent cap liner system is applied upon cell closure, featuring passive gas venting via 150 mm HDPE pipes, a 600 mm vegetative soil layer, and geocomposite drainage layers. The leachate drainage system is designed with a 2% slope towards collection wells.

Land and surroundings

The project is located on a 16.19-hectare (40-acre) site in Village Juna Katariya and Lakadia. The applicant states that no additional land acquisition is required. The site is situated 1.6 km from National Highway 15. Environmental sensitivity analysis within a 10 km radius identifies several water bodies, including the Khari River (3.15 km) and Bambudi Nadi (2.13 km). The nearest habitation is Lakadiya at 2.53 km. The ground water table is reported to be deeper than 15 metres below ground level.

Water, power and access

Total water requirement is 116.25 kilolitres per day (KLD), sourced from the Gujarat Water Supply Sewerage Board (GWSSB). This includes 94.4 KLD for industrial use and 7.85 KLD for domestic needs. The project operates as a Zero Liquid Discharge (ZLD) facility; industrial effluent (73.03 KLD) is treated in the forced evaporation system, and domestic sewage (6.62 KLD) is treated in a 24 KLD Sewage Treatment Plant (STP) for use in gardening.

Power requirement is 1,100 KVA, supplied by Paschim Gujarat Vij Company Limited (PGVCL). A 125 KVA connecting load is also mentioned for specific site operations. Fuel requirements include 80 tonnes per day of coal for the spray dryer and 6 tonnes per day of Light Diesel Oil (LDO) for the thermic fluid heater.

Environmental safeguards

Air pollution control measures include bag filters, dust collectors, and water scrubbers for the steam boiler. The spray dryers are equipped with cyclone separators, venturi scrubbers, and three-stage rinsing scrubbers. Fugitive emissions are managed through water sprinkling and asphalt roads within the premises.

A green belt is planned over 2.3 hectares (5.7 acres) within the premises, with an additional 3.03 hectares (7.5 acres) developed outside. Upon closure of landfill cells, another 6.64 hectares (16.4 acres) of greenery will be developed on the capped tops. The applicant has also filed a conservation plan for Schedule-I species sighted in the area, including the Blackbuck, Indian Grey Wolf, and various birds of prey.

ItemDetail
Expansion Capacity1.3 MMT
Total Landfill Volume (New Cells)9,16,667 cubic metres
Industrial Effluent73.03 KLD
Domestic Sewage6.62 KLD
Coal Consumption80 MT/day
LDO Consumption6 MT/day
Total Manpower127 persons
CER Allocation₹0.30 crore

Detox Building Project site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Detox Building Project: Master layout plan: landfill cells, spray dryers, and administrative buildings (preview)🔒 Sign in free to see it
Master layout plan: landfill cells, spray dryers, and administrative buildings
Detox Building Project: Regional location map showing 10km radius study area (preview)🔒 Sign in free to see it
Regional location map showing 10km radius study area
Detox Building Project: Site layout showing separate entities of DIPL and SEPPL (preview)🔒 Sign in free to see it
Site layout showing separate entities of DIPL and SEPPL
Detox Building Project: Drainage pattern map of the project surroundings (preview)🔒 Sign in free to see it
Drainage pattern map of the project surroundings

In context

76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 67% of them.

Where it is

Katariya Juna, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Detox India PVT. LTD. in Kachchh

All 3 Detox projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.