What is Developing? Open the mapMap

Cleared for impact studyIndustry · Kachchh, Gujarat

Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery (WHRB) & Thermal Power Plant] by German Green Steel and Power Ltd.

Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery (WHRB) & Thermal Power Plant] by German Green Steel and Power Ltd is a proposed industrial project in Piprapati, Bhachau, Kachchh, Gujarat. The site covers 134.3 acres. Its stated project cost is ₹700 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Sept 2025).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery (WHRB) & Thermal Power Plant] by German Green Steel and Power Ltd is a proposed industrial project in Piprapati, Bhachau, Kachchh, Gujarat. The site covers 134.3 acres.

Who is building it?

The applicant is German Green Steel and Power Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 9 Sept 2025), as of 27 Nov 2026.

Where is it?

In Piprapati, Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹700 crore and a site of 134.3 acres.

When was it filed?

The application was filed on 3 Sept 2025.

Project details

StatusCleared for impact study
Status since9 Sept 2025
Application filed3 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantGerman Green Steel and Power Limited
Land area134.3 acres (54.3 ha)
Project cost₹700 crore
Village / localityPiprapati
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-06962

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 20 Aug 2026More information requested134.3 acres₹700 crore
Early planning filed 3 Sept 2025 (this page)Cleared for impact study134.3 acres₹700 crore

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 134.3 acres, this one is larger than 73% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Piprapati, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.