Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery (WHRB) & Thermal Power Plant] by German Green Steel and Power Ltd.

Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery (WHRB) & Thermal Power Plant] by German Green Steel and Power Ltd is a proposed industrial project in Piprapati, Bhachau, Kachchh, Gujarat. The site covers 134.3 acres. Its stated project cost is ₹700 crore. As of 27 Nov 2026, its status is “More information requested” (since 14 Oct 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery (WHRB) & Thermal Power Plant] by German Green Steel and Power Ltd is a proposed industrial project in Piprapati, Bhachau, Kachchh, Gujarat. The site covers 134.3 acres.

Who is building it?

The applicant is German Green Steel and Power Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Piprapati, Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹700 crore and a site of 134.3 acres.

When was it filed?

The application was filed on 20 Aug 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of Metallurgical Plant with CPP [by waste heat Recovery (WHRB) &…

Project details

StatusMore information requested
Status since14 Oct 2026
Application filed20 Aug 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantGerman Green Steel and Power Limited
Land area134.3 acres (54.3 ha)
Project cost₹700 crore
Village / localityPiprapati
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-10812

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 20 Aug 2026 (this page)More information requested134.3 acres₹700 crore
Early planning filed 3 Sept 2025Cleared for impact study134.3 acres₹700 crore

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 134.3 acres, this one is larger than 73% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Piprapati, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.