Quick answers
What is B R Steel Industries?
B R Steel Industries is a proposed industrial project in Echhvada, Dasada, Surendranagar, Gujarat. The site covers 3.6 acres.
Who is building it?
The applicant is B.R. Steel Industries.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Echhvada, Dasada, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹14.2 crore and a site of 3.6 acres.
When was it filed?
The application was filed on 18 Jul 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 18 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | B.R. Steel Industries |
| Land area | 3.6 acres (1.4 ha) |
| Project cost | ₹14.2 crore |
| Village / locality | Echhvada |
| Taluk / tehsil | Dasada |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02222 |
In context
22 applications in Surendranagar since January 2022 are in the same category (Industry): 13 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 3.6 acres, this one is smaller than 55% of them.
Where it is
Echhvada, Dasada, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 125 mm Dia. PE Gas Pipeline route Rajrajeshwardham Jhakhan To Ahmedabad… — forest land use approved, 41.4 km away
- Mahipatsinh Malubhai Parmar (Ordinary Sand Mine Block- 1) — environmental approval granted, 44.1 km away
- Proposed Secured Landfill Facility (Capacity - 56,60,000 m3) of M/s. Greeneco… — cleared for impact study, 45.5 km away
- Mahipatsinh Malubhai Parmar (Ordinary Sand Mine Block -2) — environmental approval granted, 45.6 km away
- Industrial project by M/s. Marutinandan Engineering Creations Pvt. Ltd. — environmental approval granted, 51.8 km away
- Industrial project by M/s. Marutinandan Engineering Creations Pvt. Ltd. — cleared for impact study, 51.8 km away
- Industrial project by M/s. MARUTINANDAN ENGINEERING CREATIONS PRIVATE LIMITED — returned to applicant, 52 km away
- Rajrishi Petroleum CNG Station Connectivity — forest land use approved, 54.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.