Industrial project by M/s. MARUTINANDAN ENGINEERING CREATIONS PRIVATE LIMITED

This proposed industrial project by M/s. MARUTINANDAN ENGINEERING CREATIONS PRIVATE LIMITED is in Bhadwana, Lakhtar, Surendranagar, Gujarat. The site covers 4.1 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 4 Feb 2026).

See it on the live map All projects in Surendranagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

This proposed industrial project by M/s. MARUTINANDAN ENGINEERING CREATIONS PRIVATE LIMITED is in Bhadwana, Lakhtar, Surendranagar, Gujarat. The site covers 4.1 acres.

Who is building it?

The applicant is Marutinandan Engineering Creations Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Bhadwana, Lakhtar, Surendranagar, Gujarat.

How big is it?

It has a stated cost of ₹2 crore and a site of 4.1 acres.

When was it filed?

The application was filed on 6 Dec 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. Marutinandan Engineering Creations Pvt. Ltd.

Project details

StatusReturned to applicant
Status since4 Feb 2026
Application filed6 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMarutinandan Engineering Creations Private Limited
Land area4.1 acres (1.7 ha)
Project cost₹2 crore
Village / localityBhadwana
Taluk / tehsilLakhtar
DistrictSurendranagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08869

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Apr 2026Environmental approval granted59.4 acres₹237 crore
Early planning filed 11 Mar 2026Cleared for impact study59.4 acres₹237 crore
Early planning filed 6 Dec 2025 (this page)Returned to applicant4.1 acres₹2 crore

In context

22 applications in Surendranagar since January 2022 are in the same category (Industry): 13 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 4.1 acres, this one is larger than 68% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhadwana, Lakhtar, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Marutinandan Engineering Creations projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.