Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Swarit Sky

Swarit Sky is an approved residential project in Nikol, Sabarmati, Ahmadabad, Gujarat. It plans 205 units in 3 towers of up to 14 floors on 1.2 acres. Its stated project cost is ₹42.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 22 Dec 2024).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Swarit Sky

Project details

StatusEnvironmental approval granted
Status since22 Dec 2024
Application filed24 May 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorBuildings & townships
ApplicantMehul Thummar
UseResidential
Units205
Towers3
Floors (tallest)14
Basements2
Height45 m
Parking spaces387
Land area1.2 acres (0.5 ha)
Built-up area32,310 m² (3,47,782 sq ft)
Plot area4,881 m² (52,539 sq ft)
Project cost₹42.4 crore
Village / localityNikol
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04870

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 24 May 2024 (this page)Environmental approval granted1.2 acres₹42.4 crore
New project filed 26 Mar 2023Environmental approval granted1.2 acres₹42.4 crore

What the filings say

What is planned

Swarit Sky is a residential and commercial development proposed by the applicant, Mehul Thummar (M/s Sat Shri Developers). The project is an expansion of a previously granted environmental clearance. The revised proposal increases the building height from 8 floors to 14 floors above a ground floor/hollow plinth and two levels of basement.

The project consists of three blocks (A, B, and C) and includes the following components:

Project Specifications

ItemDetail
Total Plot Area4,881.00 square metres (0.49 hectares)
Total Built-up Area32,309.54 square metres
Residential Units162 (3 BHK)
Commercial Units43
Tallest Building14 Floors + Ground/Hollow Plinth + 2 Basements
Total Parking Provided6,422.09 square metres (297 Car Parking Spaces)
Greenbelt Area739.62 square metres

Layout and design

The project is designed with a ground-level hollow plinth for parking and common foyers. The two basement levels are dedicated to parking. Block A and B each feature two fire lifts with 13-person capacity, while Block C includes a larger foyer area.

Internal access is provided by 6.00-metre wide approach roads. The site layout includes a common plot of 492.33 square metres. The building design incorporates seismic zone norms for earthquake resistance and uses non-reflective float glass to minimize heat island effects.

Land and surroundings

The project is located on Final Plot No. 42/3/2 of Town Planning Scheme No. 110 (Nikol-Kathwada) in Nikol, Ahmedabad. The site is currently open land. The surrounding area is a developed urban zone within the Ahmedabad Municipal Corporation (AMC) limits. Notable nearby landmarks include the Naroda Railway Station (3.34 km) and Ahmedabad Airport (4.56 km). A 66 KV high-tension line runs adjacent to the 30.00-metre wide TPS road bordering the site.

Water, power and access

Water: During the operation phase, the total water requirement is estimated at 180 kilolitres per day (KLD). Fresh water demand after the first day will be 116 KLD, sourced from the AMC. Approximately 64 KLD of treated wastewater will be reused for flushing (53 KLD) and gardening (3 KLD), with the remaining 95 KLD discharged into the municipal drainage network.

Power: The operational power requirement is 5.00 MW, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). A 101 kW rooftop solar system is planned, requiring 476.38 square metres of terrace space. Emergency backup will be provided by a diesel generator (DG) set with acoustic enclosures.

Access: The site is bounded by a 30.00-metre wide TPS road and a 12.00-metre wide TPS road. Separate entry and exit points are planned to manage traffic flow.

Environmental safeguards

Timeline

The Environmental Management Plan (EMP) budget outlines a capital expenditure schedule spanning from 2023-24 to 2025-26. The total estimated capital cost for environmental safeguards is •216.98 lakhs, with a recurring annual cost of •15.3 lakhs.

Swarit Sky site plan and layout

2 drawings from the project's filings. Sign in free to see them.

Swarit Sky: Revised Layout Plan: Blocks A, B, and C with internal roads and parking (preview)🔒 Sign in free to see it
Revised Layout Plan: Blocks A, B, and C with internal roads and parking
Swarit Sky: Site Layout: Ground floor plan showing shops, foyers and common plot (preview)🔒 Sign in free to see it
Site Layout: Ground floor plan showing shops, foyers and common plot

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.

268 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.