Environmental approval grantedBuildings & townships · Surat, Gujarat

Silent Tower

Silent Tower is an approved residential project in Abrama, Kamrej, Surat, Gujarat. It plans 434 units in 8 towers of up to 14 floors on 2.7 acres. Its stated project cost is ₹85 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 7 Apr 2025).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Silent Tower?

Silent Tower is an approved residential project in Abrama, Kamrej, Surat, Gujarat. It plans 434 units in 8 towers of up to 14 floors on 2.7 acres.

Who is building it?

The applicant is Dev Infra.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 7 Apr 2025), as of 27 Nov 2026.

Where is it?

In Abrama, Kamrej, Surat, Gujarat.

How big is it?

It has a stated cost of ₹85 crore and a site of 2.7 acres.

When was it filed?

The application was filed on 25 Nov 2024.

Project details

StatusEnvironmental approval granted
Status since7 Apr 2025
Application filed25 Nov 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantDev Infra
UseResidential
Units434
Towers8
Floors (tallest)14
Basements2
Height45 m
Parking spaces617
Land area2.7 acres (1.1 ha)
Built-up area72,254 m² (7,77,735 sq ft)
Plot area10,774 m² (1,15,970 sq ft)
Project cost₹85 crore
Village / localityAbrama
Taluk / tehsilKamrej
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-06516

What the filings say

What is planned

The applicant, DEV INFRA, proposes to develop a residential project consisting of eight blocks, designated as Blocks A through H. According to the conceptual plan, each of the eight buildings will rise to a height of 14 floors above a ground level and two basement levels. The project is designed to provide a total of 434 dwelling units.

The residential units are distributed across the blocks with specific unit counts for each. Blocks A, B, D, F, and G are planned with 56 units each, while Block C will contain 60 units. Block E is designed for 42 units, and Block H will contain 64 units. The total built-up area for the development is stated as 72,253.79 square metres.

ItemDetail
Total Blocks8
Total Dwelling Units434
Total Built-up Area72,253.79 sq.mt.
Max Building Height44.81 metres
Basement Levels2
STP Capacity350 KLD
Solar Power Capacity200 KW
Proposed Tree Count270
Green Area1,352.31 sq.mt.

Layout and design

The site layout includes a network of internal roads to facilitate movement within the complex. These roads are planned to be 6.00 metres wide, with a central internal road reaching 7.50 metres in width. The ground floor is primarily dedicated to parking and entrance foyers for each block.

Two levels of basements are planned for parking and services. The first and second basements each cover an area of 8,290.01 square metres. The design incorporates specific ramp systems (Ramps A through D) with a 1:7 ratio to connect the basement levels with the ground floor.

Land and surroundings

The project is located in Abrama, within the Kamrej taluk of Surat. According to the key plan, the site is bordered by several adjacent plots, including Final Plot (FP) numbers 245, 238, 193, 267/a, and 243. The development is situated within the Preliminary Town Planning Scheme (TPS) No. 84.

Water, power and access

The project's water requirements will be supported by three underground storage tanks, each with a capacity of 2,46,000 litres. For wastewater management, the applicant proposes an MBAR-type Sewage Treatment Plant (STP) with a capacity of 350 kilolitres per day (KLD). Treated sewage is intended to be discharged into the Surat Municipal Corporation (SMC) drainage system.

Power will be supplemented by a 200 KW rooftop solar energy system, requiring approximately 1,200 square metres of terrace space. Diesel Generator (DG) sets are planned for emergency backup and will be housed in acoustic enclosures in the basement to minimize noise.

Environmental safeguards

The environmental management plan includes a green belt covering 1,352.31 square metres, which represents 12.55% of the total plot area. This area will consist of 900 square metres of lawn and 452.31 square metres of tree cover. The applicant plans to plant 270 trees of species such as Neem, Palm, Gulamhor, Asopalav, and Badam.

For solid waste management, an automatic Organic Waste Converter (OWC) with a capacity of 850 kg per day is proposed. Rainwater harvesting will be managed through a collection system and three recharge wells.

Timeline

The applicant's project report states that the entire project is expected to be completed within approximately four years. Environmental approval for the project was granted on 7 April 2025.

Silent Tower site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Silent Tower: Layout plan: building blocks, internal roads and common plots (preview)🔒 Sign in free to see it
Layout plan: building blocks, internal roads and common plots
Silent Tower: Building elevation and section: 14 floors above ground and two basements (preview)🔒 Sign in free to see it
Building elevation and section: 14 floors above ground and two basements
Silent Tower: Parking layout: ground level parking and internal circulation (preview)🔒 Sign in free to see it
Parking layout: ground level parking and internal circulation
Silent Tower: Parking area statement: detailed breakdown of resident and visitor spaces (preview)🔒 Sign in free to see it
Parking area statement: detailed breakdown of resident and visitor spaces

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.7 acres, this one is larger than 78% of them.

162 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Abrama, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.