Quick answers
What is Akshar Swarnabhoomi?
Akshar Swarnabhoomi is a lapsed building project in Jhanjharda, Junagadh City, Junagadh, Gujarat. The site covers 2.7 acres.
Who is building it?
The applicant is Gandhi Servise.
Has it been approved?
No. The application was lapsed on 19 May 2023, so it is no longer under consideration.
Where is it?
In Jhanjharda, Junagadh City, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹4 crore and a site of 2.7 acres.
When was it filed?
The application was filed on 19 May 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 May 2023 |
| Application filed | 19 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gandhi Servise |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹4 crore |
| Village / locality | Jhanjharda |
| Taluk / tehsil | Junagadh City |
| District | Junagadh |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-02393 |
What the filings say
What is planned
Akshar Swarnabhoomi is a proposed residential building project by Gandhi Servise. According to the applicant's layout plans, the project consists of five wings (A, B, C, D, and E) with a building height of 44.80 metres. Each building is designed with a basement, a stilt floor, and 14 upper floors.
The project proposes a total of 140 residential units. The floor-wise distribution shows that each wing contains 28 units. The typical floor plans for floors 1 through 14 indicate residential apartment layouts, while the stilt and basement levels are designated for parking and services.
| Item | Detail |
|---|---|
| Total Built-up Area | 47,220.95 square metres |
| Total FSI Area | 29,388.87 square metres |
| Number of Wings | 5 (A, B, C, D, E) |
| Building Height | 44.80 metres |
| Total Floors | Basement + Stilt + 14 Floors |
| Total Residential Units | 140 |
| Proposed Parking Area | 9,112.26 square metres |
| Required Trees | 275 |
| Proposed Trees | 290 |
Layout and design
The site layout features the five wings arranged in a linear fashion along the northern boundary of the plot. A 9.00-metre wide internal road provides access to the individual building entries. A common plot area of 1,132.96 square metres is situated at the western end of the site.
The design includes a basement level across the wings, with specific built-up areas for each: Wing A (1,054.05 sq.m.), Wing B (1,342.25 sq.m.), Wing C (1,158.32 sq.m.), and Wing D/E combined (1,043.43 sq.m.). The stilt floor is primarily open for parking and circulation. The terrace floor includes small built-up areas for lift machine rooms and staircases.
Water, power and access
During the construction phase, water will be sourced from local tankers or the Junagadh Municipal Corporation (JuMC). For the operation phase, the JuMC will provide the primary water supply. The applicant proposes to install low-water consuming devices such as diffused water taps and twin flushing systems to reduce demand.
Domestic sewage during construction will be managed through a septic tank and soak pit system. Once operational, wastewater will be disposed of through the JuMC drainage line. Storm water will be diverted into the municipal storm water network. The project includes three rainwater harvesting (RWH) units, each with a capacity of 15,000 litres, and one percolation well for groundwater recharge.
Power backup will be provided by Diesel Generator (DG) sets equipped with acoustic enclosures. Energy conservation measures include the use of LED lights in common areas, solar lighting for open spaces, and the installation of energy-efficient motors and pumps.
Environmental safeguards
The Environmental Management Plan (EMP) outlines several mitigation measures:
- Air Quality: Regular water sprinkling, peripheral barricading, and covering of construction materials with tarpaulin sheets to control dust.
- Waste Management: Segregation of municipal solid waste into dry and wet streams. Wet waste will be processed in an organic waste composter for use in the greenbelt.
- Noise Control: Periodic maintenance of machinery and provision of earplugs for workers.
- Greenbelt: Development of a green area with approximately 290 trees.
- Safety: Installation of fire extinguishers, hydrants, sprinklers, and a manually operated electric fire alarm system as per the National Building Code.
The applicant has allocated a total budgetary provision of ₹58 lakh for the Environmental Management Plan, which includes ₹7 lakh for construction-phase measures and ₹51 lakh for operational-phase infrastructure, including a sewage treatment plant and composting facilities.
Akshar Swarnabhoomi site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
21 applications in Junagadh since January 2022 are in the same category (Buildings & townships): 8 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 23 months from filing to approval. At 2.7 acres, this one is larger than 75% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhanjharda, Junagadh City, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed commercial building construction project Tridev Trade Centre by… — under environmental review, 750 m away
- Willingdon Dam — more information requested, 4.8 km away
- Overhead Laying of Sewerage pipeline parallal at Panjanka & Balaknath Bridge — lapsed, 5.1 km away
- Resurfacing of Existing Dolatpara Forest naka to Indreshvar Mandir road — lapsed, 5.3 km away
- Indreswar Mandir Road — more information requested, 5.3 km away
- Diversion of 0.0679 Hectare of forest land for construction of 66kV S/C line… — forest land use approved, 5.5 km away
- Overhead Laying of Sewerage pipeline parallal at Panjanka & Balaknath Bridge — more information requested, 5.6 km away
- Laying of Underground Sewer Pipeline and Construction of Pumping Station… — more information requested, 6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.