Quick answers
What is this project?
Diversion of 0.0679 Hectare of forest land for construction of 66kV S/C line from existing 132kV Junagadh S/s to proposed 66kV Motibaug (JAU) S/s by laying of 66kV 630 sq.mm. (3+1) Underground cable near 132kV Junagadh S/s on Bilkha Road, Ta. Junagadh, Dist. Junagadh is an approved road project in Palasva, Junagadh, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corporation Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 11 Oct 2024), as of 27 Nov 2026.
Where is it?
In Palasva, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹7.3 crore; a site of 0.2 acres and 680 m² of forest land.
When was it filed?
The application was filed on 17 Aug 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 11 Oct 2024 |
| Application filed | 17 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Land area | 700 m² |
| Forest land | 680 m² |
| Project cost | ₹7.3 crore |
| Village / locality | Palasva |
| Taluk / tehsil | Junagadh |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12927 |
In context
28 applications in Junagadh since January 2022 are in the same category (Roads & highways): 2 approved, 18 filed or under review, and 8 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 88% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palasva, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pareshbhai Gopalbhai Bhuva — not approved, 1.2 km away
- SAIJADBHAI HARUNBHAI VAHEVARIA (Plasva Building Limestone) — returned to applicant, 2.3 km away
- Jignesh Gopalbhai Bhuva (Block –C) — environmental approval granted, 2.3 km away
- Jignesh Gopalbhai Bhuva (Block –C) — cleared for impact study, 2.3 km away
- Willingdon Dam — more information requested, 2.5 km away
- Rashikbhai Ravjibhai Kodawala — more information requested, 2.7 km away
- Kiritkumar Nandlal Raninga — under environmental review, 2.8 km away
- Kiritkumar Nandlal Raninga — under environmental review, 2.8 km away
More from Gujarat Energy Transmission Corporation Limited in Junagadh
- Diversion of 0.1155 Hec. of protected forest land for construction of new… — lapsed
- Diversion of 0.1295 Hec. protected forest land for construction of new 220kV… — lapsed
- Diversion of 0.1085 Hec. of Protected Forest Land for Construction of New… — lapsed
- Diversion of 0.0385 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.077 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.3360 Hec. of Protected Forest Land for Construction of New 66KV… — forest land use approved
9 Gujarat Energy Transmission Corporation projects in Junagadh
All 38 Gujarat Energy Transmission Corporation projects across India