Quick answers
What is this project?
Proposed commercial building construction project Tridev Trade Centre by Tridev Infrastructure is a proposed building project in Jhanjharda, Junagadh City, Junagadh, Gujarat. The site covers 1.3 acres.
Who is building it?
The applicant is Tridev Infrastructure.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Jhanjharda, Junagadh City, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹38.2 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 30 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 14 Oct 2026 |
| Application filed | 30 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tridev Infrastructure |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹38.2 crore |
| Village / locality | Jhanjharda |
| Taluk / tehsil | Junagadh City |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09840 |
In context
21 applications in Junagadh since January 2022 are in the same category (Buildings & townships): 8 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 23 months from filing to approval. At 1.3 acres, this one is larger than 50% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhanjharda, Junagadh City, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Akshar Swarnabhoomi — lapsed, 750 m away
- Willingdon Dam — more information requested, 4.8 km away
- Diversion of 0.0679 Hectare of forest land for construction of 66kV S/C line… — forest land use approved, 5.2 km away
- Overhead Laying of Sewerage pipeline parallal at Panjanka & Balaknath Bridge — lapsed, 5.5 km away
- Pareshbhai Gopalbhai Bhuva — not approved, 5.9 km away
- Overhead Laying of Sewerage pipeline parallal at Panjanka & Balaknath Bridge — more information requested, 5.9 km away
- Resurfacing of Existing Dolatpara Forest naka to Indreshvar Mandir road — lapsed, 6 km away
- Indreswar Mandir Road — more information requested, 6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.