Quick answers
What is this project?
Jalaram Stone Quarry Re-appraisal Area-1.00.00 Survey no. -653 (Pvt. Land) is a lapsed mining project in Umra, Mahuva, Surat, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Jayshree Jalaram Stone Quarry.
Has it been approved?
No. The application was lapsed on 11 Feb 2025, so it is no longer under consideration.
Where is it?
In Umra, Mahuva, Surat, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 22 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Feb 2025 |
| Application filed | 22 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jayshree Jalaram Stone Quarry |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Umra |
| Taluk / tehsil | Mahuva |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02582 |
In context
155 applications in Surat since January 2022 are in the same category (Mining): 48 approved, 24 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 91% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Umra, Mahuva, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest and Reserve Forest Land for widening and… — more information requested, 3.1 km away
- Application for permission to lay MDPE pipeline along/across SH-165 & SH-178… — forest land use approved, 7.7 km away
- Application for Permission to Laying Mdpe Pipeline Along Various Roads for the… — forest land use approved, 9.2 km away
- Divrsion of Protected Forest Land for laying of Optical Fiber Cable Along… — lapsed, 9.4 km away
- Diversion of 0.3152 Ha. of Protected Forest land for laying of 90/63 mm Ø MDPE… — forest land use approved, 15.3 km away
- Widening and Strengthening of Bardoli - Mahua road (SH-165) — more information requested, 20.5 km away
- Bardoli to Afva to Gotasa to Sarethi to Vankaner to Allu Total length 9/330… — lapsed, 21.3 km away
- 1X630 sqmm (3+1) corrugated Ug cable laying for Radiant Polyester Ltd Tokarwa — forest land use approved, 21.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.