Quick answers
What is this project?
Application for Permission to Laying Mdpe Pipeline Along Various Roads for the City Gas Distribution of Png in Taluka Mahuva, District Surat is an approved pipeline project in Anaval, Mahuva, Surat, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Adani Total Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 11 Apr 2025), as of 27 Nov 2026.
Where is it?
In Anaval, Mahuva, Surat, Gujarat.
How big is it?
It has a stated cost of ₹1 crore; a site of 0.2 acres and 20 m² of forest land.
When was it filed?
The application was filed on 29 Nov 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 11 Apr 2025 |
| Application filed | 29 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Adani Total Gas Limited |
| Land area | 1,000 m² |
| Forest land | 20 m² |
| Project cost | ₹1 crore |
| Village / locality | Anaval |
| Taluk / tehsil | Mahuva |
| District | Surat |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-12219 |
In context
36 applications in Surat since January 2022 are in the same category (Pipelines): 16 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.2 acres, this one is smaller than 63% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anaval, Mahuva, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for permission to lay MDPE pipeline along/across SH-165 & SH-178… — forest land use approved, 1.8 km away
- Jalaram Stone Quarry Re-appraisal Area-1.00.00 Survey no. -653 (Pvt. Land) — lapsed, 9.2 km away
- Diversion of Protected Forest and Reserve Forest Land for widening and… — more information requested, 12.3 km away
- Divrsion of Protected Forest Land for laying of Optical Fiber Cable Along… — lapsed, 18.6 km away
- Diversion of 0.3152 Ha. of Protected Forest land for laying of 90/63 mm Ø MDPE… — forest land use approved, 23.8 km away
- Widening and Strengthening of Bardoli - Mahua road (SH-165) — more information requested, 29.6 km away
- 1X630 sqmm (3+1) corrugated Ug cable laying for Radiant Polyester Ltd Tokarwa — forest land use approved, 30.1 km away
- Block No. 247/A for Providing Entry/Exit Access — more information requested, 30.2 km away
More from Adani Total Gas Limited in Surat
- Application for permission to lay MDPE pipeline along/across SH-165 & SH-178… — forest land use approved
- Diversion of 0.3152 Ha. of Protected Forest land for laying of 90/63 mm Ø MDPE… — forest land use approved
3 Adani Total Gas projects in Surat
All 48 Adani Total Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.