Quick answers
What is Widening and Strengthening of Bardoli - Mahua road (SH-165)?
Widening and Strengthening of Bardoli - Mahua road (SH-165) is a proposed road project in Bamroli, Bardoli, Surat, Gujarat. It seeks 58.5 acres of forest land.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bamroli, Bardoli, Surat, Gujarat.
How big is it?
It has a stated cost of ₹18 crore and 58.5 acres (23.7 ha) of forest land.
When was it filed?
The application was filed on 17 Mar 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 7 Sept 2026 |
| Application filed | 17 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Forest land | 58.5 acres (23.7 ha) |
| Project cost | ₹18 crore |
| Village / locality | Bamroli |
| Taluk / tehsil | Bardoli |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12114 |
In context
59 applications in Surat since January 2022 are in the same category (Roads & highways): 13 approved, 30 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamroli, Bardoli, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.2100 ha Protected Forest land for The project of Widening 7.50… — forest land use approved, 4.1 km away
- Bardoli to Afva to Gotasa to Sarethi to Vankaner to Allu Total length 9/330… — lapsed, 4.3 km away
- Approach Road for New Retail Outlet on NH-53 at Km.66+143 (Between Km 66+120… — lapsed, 5.8 km away
- The Diversion Of 0.39 Hectare Protected Forest Land To Construct An Approach… — under forest review, 6.9 km away
- Diversion of 0.0011 Hectare of Protected Forest land for laying of Proposed… — forest land use approved, 7.1 km away
- Shree Navchetan Kelavani Mandal Connectivitiy — lapsed, 7.1 km away
- Palsana to Ghaluda to Ena to Dhamdod to Vanesa to Isroli Total length 16/145… — lapsed, 7.8 km away
- Diversion of 0.0337 Ha. of Protected Forest Land I.E. Road Side Strip… — in-principle approval, conditions pending, 7.9 km away
More from Executive Engineer in Surat
- Diversion of 34.6289 Ha. of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 31.5581 Hectare of Forest Land for Widening and Strengthening of… — under forest review
- Diversion of 0.90 Ha of Protected Forest Land for Widening and Strengthening… — more information requested
- Diversion of Protected Forest Land for widening of Umarpada - Ghata Road (ODR)… — more information requested
- Traffic safety improvement at the existing Vadoli Main Road × Kim Road junction — more information requested
- Diversion of Protected Forest Land for Widening to connect proposed bridge on… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.