Skyclad

Skyclad is an approved mixed-use project in Sargasan, Gandhinagar, Gujarat. It plans 140 units in 1 tower of up to 13 floors on 1.3 acres. Its stated project cost is ₹43.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Jan 2025).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Skyclad?

Skyclad is an approved mixed-use project in Sargasan, Gandhinagar, Gujarat. It plans 140 units in 1 tower of up to 13 floors on 1.3 acres.

Who is building it?

The applicant is Status Sharan Infra.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 4 Jan 2025), as of 27 Nov 2026.

Where is it?

In Sargasan, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹43.5 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 6 Jul 2024.

Project details

StatusEnvironmental approval granted
Status since4 Jan 2025
Application filed6 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantStatus Sharan Infra
UseMixed use
Units140
Towers1
Floors (tallest)13
Basements2
Height45 m
Parking spaces208
Land area1.3 acres (0.5 ha)
Built-up area32,092 m² (3,45,435 sq ft)
Plot area5,090 m² (54,788 sq ft)
Project cost₹43.5 crore
Village / localitySargasan
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-03301

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 8 Aug 2026Initial checks1.3 acres₹44.5 crore
New project filed 6 Jul 2024 (this page)Environmental approval granted1.3 acres₹43.5 crore

What the filings say

What is planned

Status Sharan Infra is developing a mixed-use commercial and residential project named Skyclad in Sargasan, Gandhinagar. The applicant's project report specifies the construction of a single building comprising two basements, a ground floor or hollow plinth, and 13 upper floors. The maximum height of the structure is planned at 44.97 metres.

The project is designed to accommodate 104 residential units and 36 commercial shops. The residential units are distributed across the 1st to 13th floors, while the ground floor is dedicated to commercial shops and a society office. The total built-up area for the project is 32,092.18 square metres, with a Floor Space Index (FSI) area of 20,275.94 square metres.

Layout and design

The building layout features three blocks (A, B, and C) integrated into a single structure. The ground floor includes a lounge area for each block, a society office of 76.48 square metres, and 36 shops. The common plot area is 510.08 square metres, which includes a platform and a space for a sub-station.

Vertical circulation is provided through 11 lifts and three staircases. The staircases are designed with widths of 2.00 metres and 2.02 metres. The project includes a 6-metre wide internal approach road and a peripheral margin of 6 metres to ensure unobstructed vehicle movement.

Land and surroundings

The project is situated on Final Plot No. 114/2 (Survey No. 428/3/2) of Town Planning Scheme No. 29 in Sargasan. The site is bounded by 18-metre wide roads on three sides and a 24-metre wide road on the fourth side. The project is located within a commercial zone (Zone III C3) as per the Revised Development Plan 2021.

Water, power and access

During the operation phase, the total water requirement is estimated at 80.7 kilolitres per day (KLD). Fresh water of 51.5 KLD will be sourced from the Gandhinagar Municipal Corporation (GMC), while the remaining 29.2 KLD will be met through treated sewage. For the construction phase, 2.25 KLD of water will be supplied via tankers.

Power will be sourced from the local grid, with a 125 KVA diesel generator set proposed for emergency backup. The applicant has committed to installing 68.68 KW of solar power generation capacity. Access to the site is provided through separate entry and exit points on the approach roads.

Environmental safeguards

The project includes an onsite Sewage Treatment Plant (STP) to treat 65.4 KLD of generated sewage. Treated water will be reused for flushing and gardening via a dual plumbing system. For solid waste, an onsite Organic Waste Convertor will process biodegradable waste, while recyclable materials will be sold to vendors.

Rainwater harvesting will be managed through two percolation wells. The green belt will cover 766.08 square metres, including a dedicated tree-covered area of 256 square metres where 128 trees will be planted. To mitigate dust during construction, the site will be barricaded with 3-metre high walls.

ItemDetail
Total Built-up Area32,092.18 sq. m.
FSI Area20,275.94 sq. m.
Residential Units104
Commercial Units36
Total Parking Space6,508 sq. m. (208 CPS)
STP Capacity65.4 KLD
Solar Power Generation68.68 KW
Tree Plantation128 trees
EMP Capital Cost₹1.95 crore
CER Allocation₹87 lakh

Skyclad site plan and layout

A drawing from the project's filings. Sign in free to see it.

Skyclad: Site layout: building blocks, common plot, roads, and parking areas (preview)🔒 Sign in free to see it
Site layout: building blocks, common plot, roads, and parking areas

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 60% of them.

165 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sargasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.