What is Developing? Open the mapMap

Initial checksIndustry · Surat, Gujarat

Application for M/S. Arcelormittal Nippon Steel India Limited to Include Long Product (Rebar) Mill With Steel Melting Shop Through "no Increase in Pollution Load Route (Nipl)" Without Increase in the Overall Liquid Steel Production & IT Will Be Restricted to 9.6 Mtpa Based on Product Demand As Per the Ec Granted Vide Ec Identification No. Ec22a008gj153411 Dated 02.03.2022

Application for M/S. Arcelormittal Nippon Steel India Limited to Include Long Product (Rebar) Mill With Steel Melting Shop Through "no Increase in Pollution Load Route (Nipl)" Without Increase in the Overall Liquid Steel Production & IT Will Be Restricted to 9.6 Mtpa Based on Product Demand As Per the Ec Granted Vide Ec Identification No. Ec22a008gj153411 Dated 02.03.2022 is a proposed industrial project in Hajira, Chorasi, Surat, Gujarat. The site covers 53.5 acres. Its stated project cost is ₹45,043.1 crore. As of 27 Nov 2026, its status is “Initial checks” (since 13 Feb 2024).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application for M/S. Arcelormittal Nippon Steel India Limited to Include Long Product (Rebar) Mill With Steel Melting Shop Through "no Increase in Pollution Load Route (Nipl)" Without Increase in the Overall Liquid Steel Production & IT Will Be Restricted to 9.6 Mtpa Based on Product Demand As Per the Ec Granted Vide Ec Identification No. Ec22a008gj153411 Dated 02.03.2022 is a proposed industrial project in Hajira, Chorasi, Surat, Gujarat. The site covers 53.5 acres.

Who is building it?

The applicant is Arcelormittal Nippon Steel India Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Hajira, Chorasi, Surat, Gujarat.

How big is it?

It has a stated cost of ₹45,043.1 crore and a site of 53.5 acres.

When was it filed?

The application was filed on 13 Feb 2024.

Project details

StatusInitial checks
Status since13 Feb 2024
Application filed13 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantArcelormittal Nippon Steel India Limited
Land area53.5 acres (21.6 ha)
Project cost₹45,043.1 crore
Village / localityHajira
Taluk / tehsilChorasi
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-03303

In context

103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 53.5 acres, this one is larger than 76% of them.

43 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hajira, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Arcelormittal Nippon Steel India Limited in Surat

9 Arcelormittal Nippon Steel projects in Surat
All 65 Arcelormittal Nippon Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.