| Status | Environmental approval granted |
|---|---|
| Status since | 25 Apr 2025 |
| Application filed | 6 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Goenka Robin Ramavtar |
| Use | Mixed use |
| Towers | 1 |
| Floors (tallest) | 19 |
| Basements | 4 |
| Height | 70 m |
| Parking spaces | 1,087 |
| Land area | 1.6 acres (0.7 ha) |
| Built-up area | 77,927 m² (8,38,798 sq ft) |
| Plot area | 6,556 m² (70,568 sq ft) |
| Project cost | ₹110 crore |
| Village / locality | Makarba |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03595 |
What the filings say
What is planned
Sankalp 480 is a proposed commercial and hotel development by Shri Robin R. Goenka. The applicant's project report describes a mixed-use building reaching a height of 70.0 metres from ground level. The project is planned on a plot of 0.66 hectares (1.63 acres) located in Makarba, Ahmedabad.
The development is divided into two primary components:
- Commercial Wing: This includes corporate houses and office spaces. The total commercial floor area is approximately 24,363.56 square metres.
- Hotel Wing: A dedicated section for hotel use, including 378 occupants across various room types and a hotel restaurant/seating area for 200 people.
Building Configuration
The structure is designed with four basement levels for parking and services, a ground floor, and 19 upper floors. The layout includes:
- Basements 1 to 4: Dedicated to mechanical and conventional parking.
- Ground Floor: Entrance lobby, reception, waiting lounge, bistro, and commercial units.
- Upper Floors: Corporate houses, office spaces, and hotel rooms. The 4th floor includes a common toilet block for the commercial wing.
Layout and design
The site layout features a central building footprint with internal roads and open spaces. A common plot area of 672.21 square metres is designated for landscaping and community facilities. The design incorporates 11 lifts, including dedicated fire lifts. The building facade is planned to be non-reflective for at least 50% of its surface area.
Geotechnical investigations conducted by KBM Engineering Research Laboratory involved drilling a test bore to a depth of 75.0 metres. The subsoil consists of various layers of clayey silt and silty sand with kankar. The ground water table was encountered at 31.0 metres below the existing ground level. The site falls within Seismic Zone III.
Water, power and access
The project's water requirements vary by phase. During the construction phase, the total water requirement is estimated at 14.5 kilolitres per day (KLD). For the operation phase, the total requirement increases to 205.06 KLD, of which 121.36 KLD will be fresh water and 83.7 KLD will be treated wastewater reused for flushing and horticulture.
Wastewater generation during operation is estimated at 161.63 KLD. This will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 200 KLD. Treated water will be reused, and the balance will be discharged into the municipal sewer line.
Access to the site is provided via a 30.0-metre wide Town Planning Scheme (TPS) road and an 18.0-metre wide TPS road. Internal access includes ramps with a 1:7 slope leading to the basement parking levels.
Environmental safeguards
The applicant has proposed an Environmental Management Plan (EMP) with a capital budget of ₹1.19 crore and an annual recurring cost of ₹12 lakh. Key measures include:
- Air Quality: Dust suppression through water sprinkling during construction and regular ambient air monitoring during operation.
- Water Management: Installation of two rainwater harvesting recharge wells and a 200 KLD STP.
- Waste Management: Segregation of solid waste into organic and inorganic components, with bio-degradable waste converted to compost.
- Greenbelt: A two-phase plantation plan along the site perimeter and internal roads using evergreen and fast-growing trees.
- Fire Safety: A comprehensive system including fire extinguishers, wet risers, automatic sprinklers, smoke detectors, and a 2,00,000-litre underground static water storage tank.
| Item | Detail |
|---|---|
| Total Built-up Area | 77,932.17 sq m |
| FSI Area | 41,980.26 sq m |
| Ground Coverage | 15% of plot |
| STP Capacity | 200 KLD |
| Rainwater Harvesting | 2 Percolation wells |
| Tree Plantation | 164 trees required |
| Seismic Zone | Zone III |
Sankalp 480 site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is larger than 53% of them.
294 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makarba, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shristii — environmental approval granted, 650 m away
- Shristii — environmental approval granted, 650 m away
- Sun Urban Park — environmental approval granted, 650 m away
- Sun Urban Park — environmental approval granted, 650 m away
- Sun Urban Park — environmental approval granted, 700 m away
- Rashmi Melliore — environmental approval granted, 700 m away
- Rashmi Melliore — environmental approval granted, 700 m away
- Westlands — environmental approval granted, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.