What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

Panchamrut-3

Panchamrut-3 is an approved residential project in Pethapur, Gandhinagar, Gujarat. It plans 190 units in 4 towers of up to 14 floors on 1.3 acres. Its stated project cost is ₹55 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Jul 2024).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Panchamrut-3?

Panchamrut-3 is an approved residential project in Pethapur, Gandhinagar, Gujarat. It plans 190 units in 4 towers of up to 14 floors on 1.3 acres.

Who is building it?

The applicant is Raj Infra.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 Jul 2024), as of 27 Nov 2026.

Where is it?

In Pethapur, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹55 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 3 Feb 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Panchamrut-3

Project details

StatusEnvironmental approval granted
Status since9 Jul 2024
Application filed3 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRaj Infra
UseResidential
Units190
Towers4
Floors (tallest)14
Basements1
Parking spaces270
Land area1.3 acres (0.5 ha)
Built-up area29,779 m² (3,20,538 sq ft)
Plot area5,058 m² (54,444 sq ft)
Project cost₹55 crore
Village / localityPethapur
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04017

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 25 Jul 2024Environmental approval granted1.3 acres₹55 crore
New project filed 3 Feb 2024 (this page)Environmental approval granted1.3 acres₹55 crore

What the filings say

What is planned

Raj Infra has received environmental approval for Panchamrut-3, a residential building project in Pethapur, Gandhinagar. The applicant's project report describes the development of four residential blocks (A, B, C, and D) with a total built-up area of 29,778.50 square metres on a plot of 0.51 hectares (1.25 acres).

The project consists of 190 residential units, including 164 three-BHK and 26 four-BHK apartments. The building configuration is as follows:

The maximum building height is 44.90 metres. The estimated project cost is ₹55 crore.

Layout and design

The site layout includes a common plot of 508 square metres. Internal roads are planned with widths of 6.00 metres and 9.00 metres, while the peripheral margin for fire tender access is 7.00 metres. The project includes two separate 6.00-metre wide gates for entry and exit.

Parking is planned across the basement and hollow plinth levels, providing a total of 270 Car Parking Spaces (CPS). This includes 212 spaces in the basement (incorporating 100 mechanized parking spots) and 58 spaces in the hollow plinth. The applicant has committed to providing 54 electric vehicle charging points.

Water, power and access

During the construction phase, water requirement is estimated at 30 kilolitres per day (KLD), sourced from tankers. For the operational phase, the total water demand is 196 KLD. The Gandhinagar Municipal Corporation (GMC) will supply 129 KLD of fresh water, while the remaining 67 KLD will be met through treated sewage for flushing and gardening.

Power will be sourced from Uttar Gujarat Vij Company Limited (UGVCL), with a maximum demand of 2,000 kW. Energy conservation measures include the installation of 225 rooftop solar panels with a capacity of 122 kW, LED lighting for common areas, and the use of Autoclaved Aerated Concrete (AAC) blocks. A 125 kVA diesel generator set is planned for emergency backup.

Environmental safeguards

The applicant proposes an onsite Sewage Treatment Plant (STP) with a capacity of 200 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Solid waste is estimated at 583 kg per day, comprising 321 kg of wet waste and 262 kg of dry waste. Wet waste will be processed in an onsite Organic Waste Converter to produce manure for the greenbelt, while dry waste will be collected by the GMC.

For rainwater management, the plan includes two percolation wells reaching a depth of 35 metres and one harvesting tank. The greenbelt will cover 788 square metres, including a tree-covered area of 280 square metres where 127 trees of local species such as Limbdo, Asopalav, and Gulmohar will be planted.

Corporate Environmental Responsibility

The applicant has allocated ₹110 lakh for Corporate Environmental Responsibility (CER) activities to be completed within three years. Planned works include:

ItemDetail
Total Built-up Area29,778.50 sq. m.
FSI Area20,198.22 sq. m.
Residential Units190
Total Parking270 CPS
Solar Power Capacity122 kW
STP Capacity200 KLD
Greenbelt Area788 sq. m.

Panchamrut-3 site plan and layout

A drawing from the project's filings. Sign in free to see it.

Panchamrut-3: Site layout: blocks, common plot, internal roads, and basement line (preview)🔒 Sign in free to see it
Site layout: blocks, common plot, internal roads, and basement line

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 60% of them.

37 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pethapur, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.