Quick answers
What is Proposed Building Construction Project by Abc Buildcon?
This approved mixed-use project by Abc Buildcon is in Pethapur, Gandhinagar, Gujarat. It plans 258 units in 4 towers of up to 14 floors on 1.9 acres.
Who is building it?
The applicant is Abc Buildcon.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Jun 2026), as of 27 Nov 2026.
Where is it?
In Pethapur, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹88.7 crore and a site of 1.9 acres.
When was it filed?
The application was filed on 2 Mar 2026.
Project details
| Official title | Proposed Building Construction Project |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Jun 2026 |
| Application filed | 2 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Abc Buildcon |
| Use | Mixed use |
| Units | 258 |
| Towers | 4 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Parking spaces | 376 |
| Land area | 1.9 acres (0.8 ha) |
| Built-up area | 54,732 m² (5,89,130 sq ft) |
| Plot area | 7,527 m² (81,020 sq ft) |
| Project cost | ₹88.7 crore |
| Village / locality | Pethapur |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11151 |
In context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.9 acres, this one is larger than 69% of them.
38 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pethapur, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Panchamrut-3 — environmental approval granted, 300 m away
- Panchamrut-3 — environmental approval granted, 300 m away
- "shreenand Ananta" — environmental approval granted, 400 m away
- ABC Destiny — under environmental review, 400 m away
- Proposed Residential cum Commercial project - "Bansari Skyview" — environmental approval granted, 550 m away
- Proposed Residential cum Commercial project - "Bansari Skyview" — environmental approval granted, 550 m away
- Railway Over Bridge in Lieu of Lc No. 9b of Kalol- Gandhinagar Bg Section at… — more information requested, 1.1 km away
- Rivera Heights — under environmental review, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.