Aarambh Greens

Aarambh Greens is an approved residential project in Chandlodiya, Sabarmati, Ahmadabad, Gujarat. It plans 648 units in 5 towers of up to 10 floors on 2.5 acres. Its stated project cost is ₹147.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Dec 2024).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since11 Dec 2024
Application filed19 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantPatel Jignesh Vasudev
UseResidential
Units648
Towers5
Floors (tallest)10
Basements1
Height34 m
Parking spaces427
Land area2.5 acres (1 ha)
Built-up area49,675 m² (5,34,697 sq ft)
Plot area9,978 m² (1,07,402 sq ft)
Project cost₹147.9 crore
Village / localityChandlodiya
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04019

What the filings say

What is planned

Aarambh Greens is a residential affordable housing project proposed by Patel Jignesh Vasudev. According to the applicant's project report, the development will consist of seven residential blocks (Blocks A to G) and a separate electrical substation. The buildings are designed with two basements, a ground floor, and 10 upper floors, reaching a total height of 33.50 metres from ground level.

The project is planned to accommodate 650 dwelling units. The unit distribution across the blocks is as follows:

Project Components

ItemDetail
Total Units650 residential flats
Building Height33.50 metres
Tallest Structure2 Basement + Ground + 10 Floors
Estimated Occupancy3,240 residents
Visitor Capacity400 persons
Common Plot Area1,033.65 sq m
STP Capacity425 KLD

Layout and design

The site layout includes internal approach roads of 6.00 metres, 7.50 metres, and 9.00 metres in width. A 12.00-metre wide Town Planning Scheme (TPS) road borders the site. The ground floor level includes hollow plinth areas dedicated to parking, along with society common amenities and electrical meter rooms. Pedestrian access is facilitated by 1.80-metre wide ramps with a 1:12 gradient.

Geotechnical investigations conducted in January 2024 involved five boreholes drilled to depths of up to 25.0 metres. The soil profile generally consists of silty sand or sandy silt in the top layers, followed by silty clay. The report recommends a raft foundation for the structures, to be laid at a depth of 10.5 metres to 11.5 metres below existing ground level.

Water, power and access

The total water requirement during the operational phase is estimated at 496.65 kilolitres per day (KLD). Of this, the fresh water requirement is 342.2 KLD, while 154.45 KLD will be met through treated wastewater used for flushing and horticulture. Wastewater generation is projected at 369.3 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 425 KLD. Excess treated water will be discharged into the municipal sewer line.

Environmental safeguards

The applicant has proposed an Environmental Management Plan (EMP) with a capital budget of ‣1.30 crore and an annual recurring cost of ‣13.5 lakh. Key measures include:

Aarambh Greens site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Aarambh Greens: Site layout: residential blocks, approach roads, and common plots (preview)🔒 Sign in free to see it
Site layout: residential blocks, approach roads, and common plots
Aarambh Greens: Location map: project site and surrounding residential societies (preview)🔒 Sign in free to see it
Location map: project site and surrounding residential societies
Aarambh Greens: Satellite view of the project site with boundary coordinates (preview)🔒 Sign in free to see it
Satellite view of the project site with boundary coordinates
Aarambh Greens: Rainwater harvesting scheme and percolation well design (preview)🔒 Sign in free to see it
Rainwater harvesting scheme and percolation well design

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is larger than 73% of them.

230 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chandlodiya, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.