Quick answers
What is Rameshkumar Keshabhai Patel?
Rameshkumar Keshabhai Patel is an approved mining project in Vasni, Bayad, Aravalli, Gujarat. The site covers 7.4 acres.
Who is building it?
The applicant is Patel Rameshkumar Keshavlal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Nov 2024), as of 27 Nov 2026.
Where is it?
In Vasni, Bayad, Aravalli, Gujarat.
How big is it?
It has a stated cost of ₹40 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 20 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Nov 2024 |
| Application filed | 20 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Patel Rameshkumar Keshavlal |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Vasni |
| Taluk / tehsil | Bayad |
| District | Aravalli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05113 |
In context
70 applications in Aravalli since January 2022 are in the same category (Mining): 18 approved, 26 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.4 acres, this one is larger than 74% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Vasni, Bayad, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening and Straigthening of existing Road Vadagam - Akrund - Jitpur Road CH-… — more information requested, 4.4 km away
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity — forest land use approved, 5.1 km away
- Mining project by M/s Pandya Vinodkumar Bhogilal — environmental approval granted, 5.5 km away
- Dharmendrasinh Kishorsinh Chauhan — not approved, 6.1 km away
- Diversion of Protected Forest Land for Widening of Dehgam – Bayad – Lunawda… — under forest review, 6.7 km away
- M/s. Raghuraj Quarry Works — not approved, 6.8 km away
- M/s. Raghuraj Quarry Works — not approved, 6.9 km away
- Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad… — lapsed, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.