Quick answers
What is M/s. Raghuraj Quarry Works?
M/s. Raghuraj Quarry Works is a rejected mining project in Jantral, Bayad, Aravalli, Gujarat. The site covers 1.2 acres.
Who is building it?
The applicant is Raghuvanshi Dalpatsingh.
Has it been approved?
No. The application was rejected on 21 Dec 2024.
Where is it?
In Jantral, Bayad, Aravalli, Gujarat.
How big is it?
It has a stated cost of ₹51 lakh and a site of 1.2 acres.
When was it filed?
The application was filed on 13 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: M/s. Raghuraj Quarry Works
Project details
| Status | Not approved |
|---|---|
| Status since | 21 Dec 2024 |
| Application filed | 13 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raghuvanshi Dalpatsingh |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹51 lakh |
| Village / locality | Jantral |
| Taluk / tehsil | Bayad |
| District | Aravalli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03108 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Aug 2024 | Not approved | 2 acres | ₹55 lakh |
| New project filed 13 Aug 2024 (this page) | Not approved | 1.2 acres | ₹51 lakh |
In context
70 applications in Aravalli since January 2022 are in the same category (Mining): 18 approved, 26 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.2 acres, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Jantral, Bayad, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s. Raghuraj Quarry Works — not approved, 100 m away
- Diversion of Protected Forest Land for Widening of Dehgam – Bayad – Lunawda… — under forest review, 700 m away
- Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad… — lapsed, 1.6 km away
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity — forest land use approved, 2.1 km away
- Permission for laying of Optical Fiber Cable on SH-69 from (1) Sathamba –… — forest land use approved, 2.6 km away
- Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad… — lapsed, 3 km away
- Widening and Straigthening of existing Road Vadagam - Akrund - Jitpur Road CH-… — more information requested, 3.8 km away
- Rameshkumar Keshabhai Patel — environmental approval granted, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.