What is this project?
Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad District Arvalli is a lapsed road project in Bhajpur, Bayad, Aravalli, Gujarat. The site covers 11.4 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
No. The application was lapsed on 6 Apr 2026, so it is no longer under consideration.
Where is it?
In Bhajpur, Bayad, Aravalli, Gujarat.
How big is it?
It has a stated cost of ₹12.5 crore; a site of 11.4 acres and 11.4 acres (4.6 ha) of forest land.
When was it filed?
The application was filed on 1 Mar 2026.
Project details
| Official title | Widening and Straightening of existing Road Dabha to Zanzari Road in Protected forest land Taluka Bayad District Arvalli. |
|---|---|
| Status | Lapsed |
| Status since | 6 Apr 2026 |
| Application filed | 1 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Land area | 11.4 acres (4.6 ha) |
| Forest land | 11.4 acres (4.6 ha) |
| Project cost | ₹12.5 crore |
| Village / locality | Bhajpur |
| Taluk / tehsil | Bayad |
| District | Aravalli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12270 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Mar 2026 (this page) | Lapsed | 11.4 acres | ₹12.5 crore |
| New project filed 2 Jan 2026 | Lapsed | 4 acres | ₹12.5 crore |
In context
14 applications in Aravalli since January 2022 are in the same category (Roads & highways): 2 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. At 11.4 acres, this one is larger than 67% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhajpur, Bayad, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening and Straightening of existing Road Dabha to Zanzari Road Taluka Bayad… — lapsed, 1.5 km away
- M/s. Raghuraj Quarry Works — not approved, 1.6 km away
- M/s. Raghuraj Quarry Works — not approved, 1.7 km away
- Diversion of Protected Forest Land for Widening of Dehgam – Bayad – Lunawda… — under forest review, 2.3 km away
- Permission for laying of Optical Fiber Cable on SH-69 from (1) Sathamba –… — forest land use approved, 2.6 km away
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity — forest land use approved, 3.2 km away
- Widening and Straigthening of existing Road Vadagam - Akrund - Jitpur Road CH-… — more information requested, 5.5 km away
- Dharmendrasinh Kishorsinh Chauhan — not approved, 7.2 km away
More from Executive Engineer in Aravalli
- Widening of Charanvada (Maradiya) To Amrapur Road Ta. Modasa Dist. Arvalli — more information requested
- Widening and Straigthening of existing Road Vadagam - Akrund - Jitpur Road CH-… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.