Quick answers
What is Power project by M/s. Welspun Living Limited?
This approved power project by M/s. Welspun Living Limited is in Morai, Vapi, Valsad, Gujarat. The site covers 47.4 acres.
Who is building it?
The applicant is Welspun India Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Jul 2024), as of 27 Nov 2026.
Where is it?
In Morai, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹25 crore and a site of 47.4 acres.
When was it filed?
The application was filed on 11 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jul 2024 |
| Application filed | 11 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Welspun India Limited |
| Land area | 47.4 acres (19.2 ha) |
| Project cost | ₹25 crore |
| Village / locality | Morai |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05417 |
In context
16 applications in Valsad since January 2022 are in the same category (Power): 9 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 47.4 acres, this one is larger than 77% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Morai, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rob in Liew of Lc No 82 at Km 177/6-8 Between Vapi-Udwada on Virar-Surat… — forest land use approved, 250 m away
- Morai Blacktrap Mining Project, Survey No. 63 Paiki, Proposed by Smt.… — lapsed, 600 m away
- Morai Blacktrap Mining Project, Survey No. 63 Paiki, Proposed by Smt.… — lapsed, 600 m away
- Mukesh Rajendraprasad Thakur — lapsed, 700 m away
- Morai Blacktrap Mining Project, Survey No. 63, Proposed by Shri Mukesh… — lapsed, 700 m away
- "The Construction Project by M/s Payal Properties Private Limited" Located at… — environmental approval granted, 750 m away
- Avadh Begonia — environmental approval granted, 1.3 km away
- Proposed Expansion of Project for Manufacturing of Synthetic Organic Chemicals… — under environmental review, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.