What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Valsad, Gujarat

Avadh Begonia

Avadh Begonia is an approved residential project in Tukwada, Pardi, Valsad, Gujarat. It plans 515 units of up to 3 floors on 36.2 acres. Its stated project cost is ₹111.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Mar 2025).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Avadh Begonia?

Avadh Begonia is an approved residential project in Tukwada, Pardi, Valsad, Gujarat. It plans 515 units of up to 3 floors on 36.2 acres.

Who is building it?

The applicant is Undhad Aayushbhai Bavkubhai.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Mar 2025), as of 27 Nov 2026.

Where is it?

In Tukwada, Pardi, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹111.5 crore and a site of 36.2 acres.

When was it filed?

The application was filed on 10 Oct 2024.

Project details

StatusEnvironmental approval granted
Status since21 Mar 2025
Application filed10 Oct 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantUndhad Aayushbhai Bavkubhai
UseResidential
Units515
Floors (tallest)3
Parking spaces568
Land area36.2 acres (14.7 ha)
Built-up area1,07,578 m² (11,57,959 sq ft)
Plot area1,46,599 m² (15,77,977 sq ft)
Project cost₹111.5 crore
Village / localityTukwada
Taluk / tehsilPardi
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-05748

What the filings say

What is planned

Avadh Begonia is a proposed residential row house project by Undhad Aayushbhai Bavkubhai in Tukwada village, Valsad. The applicant's conceptual plan describes a development of 515 residential units on a plot area of 14.66 hectares (36.22 acres). The total built-up area is planned to be 1,07,578.39 square metres.

The project consists of two main types of row houses:

Infrastructural features planned for the society include a clubhouse, a garden with a jogging track, and a children's play area. The project is expected to house approximately 2,575 residents and accommodate 515 visitors.

ItemDetail
Total Plot Area1,46,599.00 sq. mt.
Total Built-up Area1,07,578.39 sq. mt.
Total Residential Units515 Row Houses
Ground Coverage Area47,689.40 sq. mt.
Common Plot Area14,956.17 sq. mt.
Maximum Building Height11.55 m
Estimated Project Cost₹111.50 crore

Layout and design

The site layout includes five common plots (C.O.P. 1 to 5) totaling 14,956.17 square metres. The internal road network is designed with widths of 7.5 metres, 9.0 metres, and 12.0 metres. The project provides for 568 Equivalent Car Space (ECS) parking slots on the surface, exceeding the requirement of 515 slots. Provisions for electric vehicle charging are included for all 516 designated parking points.

Water, power and access

During the operation phase, the total water requirement is estimated at 436 kilolitres per day (KLD). Of this, 217 KLD will be fresh water sourced from the Gujarat Water Supply & Sewerage Board (GWSSB), while 219 KLD will be recycled water used for flushing (144 KLD) and gardening (75 KLD).

Sewage generation is expected to be 289 KLD. The applicant proposes to install a Sewage Treatment Plant (STP) with a capacity of 350 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated wastewater will be reused within the site, with a surplus of 70 KLD to be discharged into the GWSSB drainage line.

The electrical load demand is estimated at 3,700 KW, to be supplied by Dakshin Gujarat Vij Company Limited (DGVCL). For power backup, four silent diesel generator sets of 250 KVA each are proposed. Energy conservation measures include the installation of 741 solar panels with a total capacity of 400 kW, intended to power common area lighting, water pumps, and EV charging stations.

Environmental safeguards

The project plans a green belt area of 15,000 square metres, which includes 7,500 square metres of tree cover and 7,500 square metres of lawn. A total of 3,665 trees of species such as Gul mohar, Limdo, Gunda, and Kadam are proposed for planting.

For rainwater harvesting, the applicant intends to provide 37 recharge wells, each 40 metres deep, with a collection system and filtration pits. Solid waste management will involve an on-site Organic Waste Convertor (OWC) with a capacity of 500 kg/day to process approximately 464 kg/day of wet waste into manure. Dry waste (309 kg/day) will be collected in bins and disposed of through the local gram panchayat system. The budgetary provision for the Environmental Management Plan is ₹20.91 crore.

Avadh Begonia site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Avadh Begonia: Master layout plan: row houses, internal roads, and common plots (preview)🔒 Sign in free to see it
Master layout plan: row houses, internal roads, and common plots
Avadh Begonia: Detailed site layout with parking and rainwater harvesting locations (preview)🔒 Sign in free to see it
Detailed site layout with parking and rainwater harvesting locations
Avadh Begonia: Floor plans and elevation for Type A residential building (preview)🔒 Sign in free to see it
Floor plans and elevation for Type A residential building
Avadh Begonia: Satellite view of project boundaries in Tukwada (preview)🔒 Sign in free to see it
Satellite view of project boundaries in Tukwada

In context

64 applications in Valsad since January 2022 are in the same category (Buildings & townships): 46 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 36.2 acres, this one is larger than 90% of them.

29 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tukwada, Pardi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.