Keshvam Heights 2

Keshvam Heights 2 is an approved mixed-use project in Karai, Gandhinagar, Gujarat. It plans 213 units in 2 towers of up to 14 floors on 0.9 acres. Its stated project cost is ₹28.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Mar 2025).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Keshvam Heights 2?

Keshvam Heights 2 is an approved mixed-use project in Karai, Gandhinagar, Gujarat. It plans 213 units in 2 towers of up to 14 floors on 0.9 acres.

Who is building it?

The applicant is Shree Guru Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Mar 2025), as of 27 Nov 2026.

Where is it?

In Karai, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹28.3 crore and a site of 0.9 acres.

When was it filed?

The application was filed on 10 Oct 2024.

Project details

StatusEnvironmental approval granted
Status since21 Mar 2025
Application filed10 Oct 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantShree Guru Developers
UseMixed use
Units213
Towers2
Floors (tallest)14
Basements2
Parking spaces235
Land area3,800 m²
Built-up area26,888 m² (2,89,420 sq ft)
Plot area3,803 m² (40,935 sq ft)
Project cost₹28.3 crore
Village / localityKarai
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-05494

What the filings say

What is planned

Shree Guru Developers proposes the construction of Keshvam Heights 2, a residential and commercial project located in Karai, Gandhinagar. The applicant's master plan details a development comprising four blocks (A, B, C, and D) with a maximum height of 14 floors above ground level.

The project is designed as an affordable housing development with a total of 213 units. This includes 192 residential flats and 21 commercial shops. The residential units are distributed across the 14 floors, while the commercial components are located on the ground floor. The total built-up area for the project is 26,888.07 square metres.

ItemDetail
Total Units213 (192 Flats, 21 Shops)
Maximum Floors14 Floors + Hollow Plinth
Basements2 Levels
Total Built-up Area26,888.07 sq. m.
Total F.S.I. Area15,644.29 sq. m.
Common Plot Area380.51 sq. m. (10% of plot)
Required Trees95

Layout and design

The project layout features four interconnected blocks arranged around a central common plot of 380.51 square metres (0.09 hectares). Parking is provided across two basement levels and a hollow plinth at the ground level.

Vertical circulation is managed by eight lifts in total. Blocks A and B are served by two lifts each (one passenger and one fire lift), and Blocks C and D are similarly equipped. The design includes a society office of 56.67 square metres located within the common plot area for the use of residents.

Water, power and access

The project site is accessed via a 36.00-metre wide Town Planning Scheme (TPS) road, with a 6.00-metre wide internal approach road.

Water management plans include a sewage treatment plant (STP) with a capacity of 139 KLD located below ground level. Total wastewater generation is estimated at 95,850 litres per day. For water storage, the applicant proposes an underground water tank with a capacity of 1,00,000 litres and an overhead tank of 20,000 litres. Rainwater harvesting will be implemented through a percolation well designed to reach a depth of 60.00 metres.

Environmental safeguards

The applicant has planned for 95 trees to be planted on the site, based on a requirement of 5 trees per 200 square metres of plot area. Waste management includes the provision of 24 container bins of 80-litre capacity for residential waste and one bin for commercial waste. Fire safety measures include a hydrant system, fire extinguishers (CO2 and DCP types), a lightning arrester, and photo-luminescent signage along all exit routes. A dedicated fire power supply will be maintained for the fire pump, alarm system, and fire lifts.

Keshvam Heights 2 site plan and layout

A drawing from the project's filings. Sign in free to see it.

Keshvam Heights 2: Master plan: four blocks, common plot, STP layout and floor area tables (preview)🔒 Sign in free to see it
Master plan: four blocks, common plot, STP layout and floor area tables

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 86% of them.

144 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Karai, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shree Guru Developers in Gandhinagar

All 3 Shree Guru Developers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.