Quick answers
What is Sankalp Adwait?
Sankalp Adwait is an approved residential project in Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The site covers 0.8 acres.
Who is building it?
The applicant is Divyasankalp Developers LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Jun 2026), as of 27 Nov 2026.
Where is it?
In Chiloda(Naroda) (Ct), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹25.9 crore and a site of 0.8 acres.
When was it filed?
The application was filed on 30 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Jun 2026 |
| Application filed | 30 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Buildings & townships |
| Applicant | Divyasankalp Developers LLP |
| Use | Residential |
| Land area | 3,400 m² |
| Project cost | ₹25.9 crore |
| Village / locality | Chiloda(Naroda) (Ct) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11286 |
What the filings say
What is planned
Divyasankalp Developers LLP proposes a residential and commercial project named "Sankalp Adwait" (also referred to as "Iconic Arise" in some project documents). The development is planned on a plot of 0.34 hectares (0.84 acres) with a total built-up area of 22,590.67 square metres.
The project consists of a single building divided into three blocks (A, B, and C). The structural scope for all blocks includes two basement levels, a ground floor (comprising a hollow plinth and a solid plinth), and 12 upper floors.
The residential component will feature 144 units, all designed as 3BHK apartments. The commercial component will consist of seven shops located on the ground floor.
Layout and design
The project includes specific provisions for vertical movement and safety. Each block is designed with dedicated staircases and lifts. Block A, the commercial and residential block, will have two staircases and two lifts (including one fire lift). Blocks B and C will each have one staircase and two lifts. The maximum travel distance to a staircase is approximately 23.20 metres.
Parking is planned across the two basement levels and the hollow plinth area, providing a total of 203 car parking spaces (CPS). The applicant has committed to providing electric vehicle charging facilities for 20% of these spaces. The design also specifies a basement height of over 4.5 metres to allow for the potential future installation of mechanical parking systems.
Water, power and access
During the construction phase, water demand is estimated at 25 kilolitres per day (KLD), to be supplied via tankers. For the operational phase, the total water requirement is projected at 137.5 KLD. Of this, 84.7 KLD of fresh water will be sourced from the Ahmedabad Urban Development Authority (AUDA), while the remaining 57 KLD will be met through treated sewage for flushing and gardening.
A sewage treatment plant (STP) with a capacity of 150 KLD will be installed on-site. Treated wastewater will be recycled, with any excess discharged into the AUDA drainage line.
Power backup will be provided by a 120 KVA diesel generator set equipped with acoustic enclosures. The project also incorporates solar power generation with a capacity of 68.08 KW for common area lighting and street lights.
Environmental safeguards
The applicant plans to develop a green belt covering 410.12 square metres, which represents approximately 10% of the plot area. This will include 86 indigenous trees. Solid waste management involves source segregation; biodegradable waste will be processed in an on-site organic waste converter, while recyclable materials will be sold to vendors.
For dust mitigation during construction, the project will use windbreakers up to 10 metres high, regular water sprinkling, and covers for construction material vehicles. Energy conservation measures include the use of natural lighting, aerated blocks, LED fixtures, and rooftop thermal insulation.
| Item | Detail |
|---|---|
| Total Built-up Area | 22,590.67 m2 |
| FSI Area | 13,149.49 m2 |
| Residential Units | 144 (3BHK) |
| Commercial Units | 7 Shops |
| STP Capacity | 150 KLD |
| Total Parking | 203 Cars |
| Solar Power | 68.08 KW |
| Green Belt Area | 410.12 m2 |
In context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.8 acres, this one is smaller than 94% of them.
150 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential and Commercial Building Construction Project by Kabindra Kumar — environmental approval granted, 0 m away
- Shivansh Sky Track — more information requested, 50 m away
- The Rhythm Skyline — environmental approval granted, 100 m away
- The Rhythm Skyline — environmental approval granted, 100 m away
- Shyam Status 2 — environmental approval granted, 100 m away
- Swastik Homes — initial checks, 200 m away
- Keshvam Heights — environmental approval granted, 250 m away
- Keshvam Heights 2 — environmental approval granted, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.