What is Setting up of Cement Grinding Plant (OPC, PSC & PPC)?
Setting up of Cement Grinding Plant (OPC, PSC & PPC) is a proposed industrial project in Limla (Ct), Chorasi, Surat, Gujarat. The site covers 92.9 acres.
Who is building it?
The applicant is Vadraj Cement Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Limla (Ct), Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹778.8 crore and a site of 92.9 acres.
When was it filed?
The application was filed on 29 Oct 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Sept 2026 |
| Application filed | 29 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Vadraj Cement Limited |
| Land area | 92.9 acres (37.6 ha) |
| Project cost | ₹778.8 crore |
| Village / locality | Limla (Ct) |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06981 |
In context
103 applications in Surat since January 2022 are in the same category (Industry): 59 approved, 29 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 92.9 acres, this one is larger than 77% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Limla (Ct), Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed change in Product Mix Application by M/s. Vadraj Cement Limited (Old… — initial checks, 0 m away
- Setting up of the Captive Jetty(4.95 MMTPA Cargo Handling) — environmental approval granted, 2 km away
- Krishak Bharati Cooperative Limited (Kribhco) — environmental approval granted, 3.4 km away
- 66KV Ichchhapore - ABG (PDC) upto 66KV Mora SS line by under ground cable 1C X… — forest land use approved, 3.4 km away
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed, 3.6 km away
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed, 3.6 km away
- AMNS International School Relocation — recommended by coastal authority, 3.8 km away
- AMNS International School Relocation — environmental approval granted, 3.8 km away
More from Vadraj Cement Limited in Surat
- Proposed change in Product Mix Application by M/s. Vadraj Cement Limited (Old… — initial checks
- Setting up of the Captive Jetty(4.95 MMTPA Cargo Handling) — environmental approval granted
3 Vadraj Cement projects in Surat
All 8 Vadraj Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.