Quick answers
What is this project?
Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing / Parallel for Gwssb / Variav Aug Phase-1 Water Supply Pipeline Project for Jal Jivan Mission (Jjm) Tel.Choryasi, of Surat(Hec 0.79) is a lapsed pipeline project in Hajira, Chorasi, Surat, Gujarat. The site covers 2 acres.
Who is building it?
The applicant is Gujarat Water Supply and Sewerage Board.
Has it been approved?
No. The application was lapsed on 16 Nov 2023, so it is no longer under consideration.
Where is it?
In Hajira, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹53.2 crore; a site of 2 acres and 2 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 23 Mar 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing / Parallel…
Project details
| Official title | Proposal for Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing / Parallel for Gwssb / Variav Aug Phase-1 Water Supply Pipeline Project for Jal Jivan Mission (Jjm) in Protected Forest Area Tel.Choryasi, of Surat(Hec 0.79) |
|---|---|
| Status | Lapsed |
| Status since | 16 Nov 2023 |
| Application filed | 23 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Water Supply and Sewerage Board |
| Land area | 2 acres (0.8 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹53.2 crore |
| Village / locality | Hajira |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12585 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Apr 2023 | Lapsed | 2 acres | ₹53.2 crore |
| New project filed 23 Mar 2023 (this page) | Lapsed | 2 acres | ₹53.2 crore |
In context
36 applications in Surat since January 2022 are in the same category (Pipelines): 16 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2 acres, this one is larger than 70% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hajira, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed, 0 m away
- Port and coastal project by Shell Energy India Pvt. Ltd. — environmental approval granted, 1.3 km away
- Port and coastal project by Shell Energy India Pvt. Ltd. — cleared for impact study, 1.3 km away
- Transfer of Environmental Clearance granted to Sanghi Industries Limited for… — under environmental review, 1.6 km away
- Proposed Expansion of Heavy Engineering Equipments Manufacturing Plant at A.… — lapsed, 1.9 km away
- Diversion of 38.8633 Ha of forest land — lapsed, 2.2 km away
- Partial Change of Land-Use of 25.00 Ha. Unclassed Forest Land permitted for… — under forest review, 2.7 km away
- Partial Change of Land-Use of 7.34 Ha. out of total 25.00 Ha. Unclassed Forest… — under forest review, 2.7 km away
More from Gujarat Water Supply and Sewerage Board in Surat
- Grant of Permission Required for laying of Drinking water pipeline, crossing /… — forest land use approved
- Diversion of 1.50 Ha. Reserved Forest land for the Construction of New water… — lapsed
- Aug. Variyav Reginal Water Supply Scheme Ph-2 — lapsed
- Aug. Variyav RWSS ph-2 — lapsed
6 Gujarat Water Supply and Sewerage Board projects in Surat
All 26 Gujarat Water Supply and Sewerage Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.