66KV Ichchhapore - ABG (PDC) upto 66KV Mora SS line by under ground cable 1C X 630sqmm is an approved project in Mora, Chorasi, Surat, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Nov 2025), as of 27 Nov 2026.
Where is it?
In Mora, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹6.8 crore; a site of 0.3 acres and 1,150 m² of forest land.
When was it filed?
The application was filed on 20 Mar 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Nov 2025 |
| Application filed | 20 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 1,100 m² |
| Forest land | 1,150 m² |
| Project cost | ₹6.8 crore |
| Village / locality | Mora |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13467 |
In context
23 applications in Surat since January 2022 are in the same category (Other): 4 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 86% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mora, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- AMNS International School Relocation — recommended by coastal authority, 2.8 km away
- AMNS International School Relocation — environmental approval granted, 2.8 km away
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed, 3.1 km away
- Grant of Permission Required for Laying of Drinking Water Pipeline, Crossing /… — lapsed, 3.1 km away
- Transfer of Environmental Clearance granted to Sanghi Industries Limited for… — under environmental review, 3.4 km away
- Proposed change in Product Mix Application by M/s. Vadraj Cement Limited (Old… — initial checks, 3.4 km away
- Setting up of Cement Grinding Plant (OPC, PSC & PPC) — more information requested, 3.4 km away
- Proposed Expansion of Heavy Engineering Equipments Manufacturing Plant at A.… — lapsed, 3.5 km away
More from Gujarat Energy Transmission Corp LTD in Surat
- Diversion of Forest Land Having 0.2709 Ha. for Forest Clearance for Laying of… — more information requested
- Diversion of Social Forest Land of 0.1458 Hac. for Forest Clearance for Laying… — forest land use approved
- Diversion of Protected Forest Land of 0.3155 Hac. for Forest Clearance for… — forest land use approved
- 66kv Ichchhapore Variyav2 & Ichchhapore Bhatha UGC link line — forest land use approved
- Submission of Forest Land Proposal for Diversion of Protected Forest Land of… — more information requested
- Forest Land 0.3346hac. for Forest Clearance for Laying of 220KV Under Ground… — forest land use approved
20 Gujarat Energy Transmission Corp projects in Surat
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.