One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion in production capacity of Synthetic Organic Chemicals (API / Bulk…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 2 Jun 2025 |
| Application filed | 8 May 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Sterling Biotech Limited |
| Land area | 74.1 acres (30 ha) |
| Project cost | ₹559.7 crore |
| Village / locality | Abhol |
| Taluk / tehsil | Padra |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07968 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 8 Dec 2025 | Under environmental review | 74.1 acres | ₹559.7 crore |
| Expansion filed 8 May 2025 (this page) | Returned to applicant | 74.1 acres | ₹559.7 crore |
| Early planning filed 9 Jul 2024 | Cleared for impact study | 74.1 acres | ₹559.7 crore |
In context
178 applications in Vadodara since January 2022 are in the same category (Industry): 91 approved, 71 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 74.1 acres, this one is larger than 92% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abhol, Padra, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion in production capacity of Synthetic Organic Chemicals (API… — under environmental review, 0 m away
- Proposed Expansion in production capacity of Synthetic Organic Chemicals (API… — cleared for impact study, 0 m away
- Diversion of Forest Area – 0.0960 Ha. User Agency's Jafarpara Village Solar… — more information requested, 900 m away
- To set up ground-mounted panels Solar Park in Jambusar Taluka — more information requested, 1.4 km away
- Set up Solar Power Project — forest land use approved, 3.1 km away
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed, 3.2 km away
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed, 5.3 km away
- Mining project by Milestone Preservatives Pvt. Ltd — initial checks, 5.6 km away
All 3 Sterling Biotech projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.