Quick answers
What is Vasupujya Rio Crest?
Vasupujya Rio Crest is an approved residential project in Pal, Majura, Surat, Gujarat. The site covers 1.5 acres.
Who is building it?
The applicant is Vasupujya Infrastructures LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Feb 2026), as of 27 Nov 2026.
Where is it?
In Pal, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹224 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 19 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Feb 2026 |
| Application filed | 19 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Buildings & townships |
| Applicant | Vasupujya Infrastructures LLP |
| Use | Residential |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹224 crore |
| Village / locality | Pal |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08029 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 Mar 2026 | Environmental approval granted | 1.5 acres | ₹224 crore |
| New project filed 18 Feb 2026 | Withdrawn | 1.5 acres | ₹224 crore |
| Ownership transfer filed 19 Dec 2025 (this page) | Environmental approval granted | 1.5 acres | ₹224 crore |
What the filings say
What is planned
Vasupujya Infrastructures LLP proposes to expand the "Vasupujya Rio Crest" project, a commercial high-rise building in Surat. The applicant's project report indicates a significant increase in the building's scope compared to a previously granted environmental clearance. The project is planned as a single commercial building with a maximum height of 142.79 metres.
The building is designed with three basements, a ground floor with a hollow plinth, and 40 upper floors. It will house a total of 327 commercial units, including shops, offices, and two restaurants. The total built-up area is planned at 75,199.9 square metres, with a Floor Space Index (FSI) area of 31,618.47 square metres.
Project Components
| Item | Detail |
|---|---|
| Total Units | 327 (Shops, Offices, Restaurants) |
| Building Height | 142.79 metres |
| Floors | 3 Basements + G + 40 Floors |
| Total Built-up Area | 75,199.9 square metres |
| FSI Area | 31,618.47 square metres |
| Total Parking | 606 Equivalent Car Spaces (ECS) |
| Estimated Population | 3,404 persons (staff and visitors) |
Layout and design
The project is situated on a plot of 0.59 hectares (1.45 acres). The ground coverage is planned at 2,436.52 square metres. The building design incorporates a hollow plinth at the ground level.
Vertical movement is supported by a total of 11 lifts, including three fire lifts and eight passenger lifts. For emergency evacuation, two staircases with a width of 2.00 metres each are provided, ensuring a maximum travel distance of 4.5 metres from any unit door to a staircase. The design also includes refuge areas at intervals, with the first at approximately 24 metres height and subsequent areas every 15 metres.
Parking is distributed across multiple levels to accommodate 606 ECS:
- Basements: 417 ECS across three levels.
- Hollow Plinth: 11 ECS.
- Surface Parking: 58 ECS.
- Layered Parking: 120 ECS across five layers (1st to 5th floors).
Water, power and access
During the construction phase, water will be sourced from private tankers, with a requirement of 14.00 kilolitres per day (KLD). For the operation phase, the Surat Municipal Corporation (SMC) will be the primary source of water. The total water requirement is estimated at 122 KLD, of which 64.78 KLD will be fresh water and 57.22 KLD will be recycled from the on-site sewage treatment plant (STP).
Waste water generation is expected to be 96 KLD. The applicant proposes an on-site STP with a capacity of 110 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing (54.88 KLD) and gardening (2.34 KLD), with the remaining 38.78 KLD discharged into the SMC underground drainage line. A dual plumbing system is planned to facilitate this reuse.
The power requirement is estimated at 1,489 kW. For emergency backup, two diesel generator sets of 125 kVA each are proposed. The project also includes a rooftop solar power system of 75 kW.
Environmental safeguards
The applicant has allocated ₹373.5 lakh for capital expenditure on environmental management and ₹31.56 lakh for annual recurring costs. A green belt of 586 square metres (approximately 10% of the plot area) is planned, featuring 150 trees and lawn areas.
For rainwater management, the project will include a collection system and two percolation wells for groundwater recharge. Solid waste management involves an on-site Organic Waste Converter (OWC) to treat approximately 175.52 kg/day of wet waste. Dry waste (263.28 kg/day) will be segregated and sold to vendors.
Fire safety measures include a wet riser system, automatic sprinklers in the basements, fire extinguishers, and a 1,00,000-litre underground static water storage tank supplemented by a 20,000-litre terrace tank.
Vasupujya Rio Crest site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is smaller than 53% of them.
141 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pal, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vasupujya Rio Crest — environmental approval granted, 0 m away
- Vasupujya Rio Crest — withdrawn, 0 m away
- "vasupujya" — environmental approval granted, 0 m away
- Elinor — environmental approval granted, 300 m away
- Residential Building Project by Vinod Patel — environmental approval granted, 300 m away
- "casa Vista" — environmental approval granted, 350 m away
- Sky Villa — lapsed, 400 m away
- Veer Arista — environmental approval granted, 500 m away
All 3 Vasupujya Infrastructures projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.