Quick answers
What is Veer Arista?
Veer Arista is an approved building project in Pal, Majura, Surat, Gujarat. The site covers 1.3 acres.
Who is building it?
The applicant is Adarsh Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Nov 2022), as of 27 Nov 2026.
Where is it?
In Pal, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹54.1 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 17 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Nov 2022 |
| Application filed | 17 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adarsh Patel |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹54.1 crore |
| Village / locality | Pal |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00258 |
What the filings say
What is planned
Veer Arista is a residential building project proposed by the applicant at Pal in Surat. The project report describes the development of three residential buildings, each consisting of a basement, a hollow plinth, and 11 floors above ground. The project is designed to provide a total of 100 residential units.
Infrastructure features planned for the site include a children's play area, a garden with a jogging park, and a clubhouse for the society. The total built-up area is specified as 27,466.00 square metres on a plot area of 5,245.82 square metres.
| Item | Detail |
|---|---|
| Number of Buildings | 3 |
| Floors | Basement + Hollow Plinth + 11 Floors |
| Total Residential Units | 100 |
| Total Built-up Area | 27,466.00 sq. mt. |
| Maximum Building Height | 37.32 m |
| Expected Residents | 500 |
Layout and design
The three buildings are designated as Building A, Building B, and Building C. Building A has the largest total built-up area at 6,936.62 square metres, followed by Building C at 5,782.44 square metres and Building B at 5,178.51 square metres. The ground floor and hollow plinth areas are dedicated to parking and common services.
Designated parking space is provided across the basement, hollow plinth, and first floor. The total proposed parking area is 6,986.18 square metres, providing 235 Equivalent Car Spaces (ECS). This includes 107 spaces in the basement, 50 in the hollow plinth, and 78 on the first floor.
Water, power and access
During the operation phase, the total water requirement is estimated at 42 kilolitres per day (KLD), which will be sourced from the Surat Municipal Corporation (SMC). The project includes a wastewater system designed to handle a maximum generation of 56 KLD. A Sewage Treatment Plant (STP) using Moving Bed Biofilm Reactor (MBBR) technology with a capacity of 70 KLD will be installed. Treated water (31 KLD) will be recycled for flushing and gardening, while the remaining 25 KLD will be discharged into the SMC drainage line.
The estimated electrical load demand for the development is 550 KW, to be supplied by Dakshin Gujarat Vij Company Limited (DGVCL). For emergency backup, the applicant proposes to install one silent diesel generator set of 125 KVA. Energy conservation measures include the use of LED lighting in common areas, solar-based power systems for every 10th street light, and a 50 KW rooftop solar power generation system consisting of 93 panels.
Access to the site is provided via two 15-metre wide roads, with two entry and exit gates planned for the premises.
Environmental safeguards
The project includes a green belt development plan covering 550 square metres (0.05 hectares), which represents approximately 10.48% of the plot area. The applicant plans to plant 85 trees, including species such as Gulmohar, Jambu, and Limdo.
For rainwater harvesting, the project will use two recharge wells. Stormwater from the roof will be directed through filtration pits before being stored in a beautification tank or recharged into the ground. Solid waste management will involve an organic waste converter (OWC) with a capacity of 100 kg per day to process kitchen waste into manure for use on-site. Inorganic waste, estimated at 100-130 kg per day, will be collected and disposed of as per SMC practices.
Timeline
In an undertaking dated 18 October 2022, the applicant stated that no construction activity had started at the proposed site. The project cost is estimated at ₹54.10 crore, with a budgetary provision of ₹571.2 lakh for the Environmental Management Plan, including capital costs for the STP, solid waste management, and solar energy systems.
Veer Arista site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 66% of them.
133 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pal, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Universal Majesty — environmental approval granted, 500 m away
- Vasupujya Rio Crest — environmental approval granted, 500 m away
- Vasupujya Rio Crest — withdrawn, 500 m away
- Vasupujya Rio Crest — environmental approval granted, 500 m away
- "vasupujya" — environmental approval granted, 500 m away
- Elinor — environmental approval granted, 600 m away
- Universal Commercial Capital — environmental approval granted, 600 m away
- Veer Arihanta — environmental approval granted, 650 m away