Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jul 2025 |
| Application filed | 23 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kaynes Semicon Private Limited |
| Use | Industrial |
| Units | 16 |
| Towers | 16 |
| Floors (tallest) | 3 |
| Height | 13 m |
| Parking spaces | 732 |
| Land area | 45.6 acres (18.4 ha) |
| Built-up area | 63,803 m² (6,86,769 sq ft) |
| Plot area | 1,84,357 m² (19,84,400 sq ft) |
| Project cost | ₹3,518 crore |
| Village / locality | Hirapur |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-08384 |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 45.6 acres, this one is larger than 95% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hirapur, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of… — more information requested, 850 m away
- Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of… — cleared for impact study, 850 m away
- Outsourced Semiconductor Assembly and Testing (OSAT) Facility — environmental approval granted, 1.2 km away
- Outsourced Semiconductor Assembly and Testing (OSAT) Facility — environmental approval granted, 1.2 km away
- Shed for Industrial Purpose by M/s. TSMT Electronics (India) Pvt. Ltd — initial checks, 1.3 km away
- Industrial project by M/s. Metronox Private Limited — environmental approval granted, 1.7 km away
- Industrial project by M/s. Metronox Private Limited — cleared for impact study, 1.7 km away
- Industrial project by M/s. Metronox Private Limited — cleared for impact study, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.