What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Ahmadabad, Gujarat

Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of Ministry of Electronics and Information Technology (MEITY), Government of India]

Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of Ministry of Electronics and Information Technology (MEITY), Government of India] is a proposed industrial building project in Charal, Sanand, Ahmadabad, Gujarat. It plans 33 towers of up to 4 floors on 226.2 acres. Its stated project cost is ₹464.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Aug 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleSetting up of Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of Ministry of Electronics and Information Technology (MEITY), Government of India]
StatusCleared for impact study
Status since13 Aug 2026
Application filed13 Apr 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantGujarat Industrial Development Corporation
UseIndustrial
Towers33
Floors (tallest)4
Height13 m
Parking spaces530
Land area226.2 acres (91.5 ha)
Built-up area1,26,120 m² (13,57,543 sq ft)
Plot area9,15,300 m² (98,52,198 sq ft)
Project cost₹464.6 crore
Village / localityCharal
Taluk / tehsilSanand
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-09945

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 14 Aug 2026Under environmental review146.4 acres₹178 crore
New project filed 13 Aug 2026More information requested226.2 acres₹464.6 crore
Early planning filed 13 Apr 2026 (this page)Cleared for impact study226.2 acres₹464.6 crore

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 226.2 acres, this one is larger than 97% of them.

19 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Charal, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

3 Gujarat Industrial Development Corporation projects in Ahmedabad
All 21 Gujarat Industrial Development Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.