Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 May 2025 |
| Application filed | 10 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Cg Semi Private Limited |
| Use | Industrial |
| Units | 16 |
| Towers | 16 |
| Floors (tallest) | 2 |
| Basements | 1 |
| Parking spaces | 601 |
| Land area | 28.5 acres (11.5 ha) |
| Built-up area | 81,381 m² (8,75,977 sq ft) |
| Plot area | 1,15,410 m² (12,42,262 sq ft) |
| Project cost | ₹7,049 crore |
| Village / locality | Hirapur |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09090 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 28 Jul 2025 | Environmental approval granted | 28.5 acres | ₹7,049 crore |
| New project filed 10 Jan 2025 (this page) | Environmental approval granted | 28.5 acres | ₹7,049 crore |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 28.5 acres, this one is larger than 94% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hirapur, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Outsourced Semiconductor Assembly and Testing (OSAT) Facility — environmental approval granted, 0 m away
- Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of… — more information requested, 850 m away
- Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of… — cleared for impact study, 850 m away
- Shed for Industrial Purpose by M/s. TSMT Electronics (India) Pvt. Ltd — initial checks, 1.1 km away
- Electronics Manufacturing Cluster (EMC) [Under Modified EMC 2.0 Scheme of… — under environmental review, 1.1 km away
- Outsourced Semiconductor Assembly & Test (OSAT) Facility — environmental approval granted, 1.2 km away
- Environmental Clearance for Proposed Expansion for Assembly, Testing, Marking,… — environmental approval granted, 2 km away
- Environmental Clearance for Proposed Expansion for Assembly, Testing, Marking,… — environmental approval granted, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.